My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc. 1/22/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
Perteet Inc. 1/22/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 9:03:10 AM
Creation date
2/18/2022 9:03:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc.
Approval Date
1/22/2022
End Date
12/30/2023
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Silver Lake Trail
Tracking Number
0003077
Total Compensation
$25,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SILVER LAKE TRAIL STORMWATER ASSISTANCE <br /> Agreement with Perteet Inc. December 17,2021 <br /> Assumptions: <br /> • Project duration assumed to include up to three invoice periods. <br /> • Up to two(2)progress reports and invoices will be prepared for this Scope of Services. <br /> • There will be no in-person meetings with the City,only email and phone communication. <br /> Deliverables: <br /> • Consultant's Standard Monthly Progress Report/Invoice(up to two[2],hard copy) <br /> Task 2 — Drainage Report Preparation <br /> Consultant will prepare a full drainage report which will document the City's trail design and how it meets the <br /> stormwater minimum requirements. Drainage report preparation will include the following work elements: <br /> • Conduct site visit so the Consultant can familiarize themselves with the project site,drainage patterns, <br /> adjacent topography and land use,sensitive areas,and identify if there are any areas of concern related <br /> to project site drainage. <br /> • Review the design plans prepared by City staff. <br /> • Coordinate with City staff via email and Teams,as needed,to appropriately document the project and <br /> to clearly show how the trail project is meeting the stormwater minimum requirements. <br /> • Prepare a drainage report in support of the proposed trail improvements.Drainage report will follow City <br /> of Everett standard drainage report format and its content will be brief and its size limited to match the <br /> scale of this type of project.The level of effort associated with the preparation of the drainage report is <br /> limited to the hours contained in the fee proposal. <br /> Assumptions: <br /> • Given the Site's proximity to Silver Lake and its runoff discharging into the lake nearby,a downstream <br /> and upstream reconnaissance will not be conducted. Survey,City mapping and GIS information will be <br /> used to identify and demonstrate the downstream runoff flow paths. <br /> • Improvements will not trigger flow control or water quality treatment requirements. <br /> • City to provide Consultant with calculations of City designed BMPs for discussion and inclusion in the <br /> report. <br /> • City to provide Consultant with determination of effective and ineffective impervious surfaces in <br /> accordance with the 2019 Stormwater Management Manual for Western Washington. <br /> • Consultant will create existing and proposed impervious area mapping in order to support the threshold <br /> analysis for the project. City to provide all survey,linework and,if available,impervious area hatching. <br /> • No design work or design calculations will be performed by the Consultant. <br /> • City to provide Consultant with geotechnical and environmental documents associated with this project, <br /> if they exist. <br /> • City to provide Consultant with all project mapping and survey that has been produced to date for this <br /> project. Consultant to use or modify the mapping for the report at their discretion. <br /> • City to provide Plans for inclusion in the Draft and Final Drainage Report. <br /> Deliverables: <br /> • Draft Drainage Report(PDF,via email) <br /> 2 <br /> File location: https;//perteet.sharepoint.com/sites/ActiveProjects/20210234EverettSilver_Loke_Trail_SEPAlnternal/Project Management/Scope and <br /> Fee/Silver Lake Trail Stormwater Assistance/Everett Silver Lake Trail Stormwater Scope of Services_2021-12-17.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.