APPROVED
<br />PUBLIC WO�i EPART ENT
<br />BY
<br />DATE c' "7 1 z-a
<br />CITY OF EVERETT REVIEWED FOR PERMIT
<br />HENOK l4t AF#
<br />GENERAL NOTES PROJECT
<br />SYMBOL NOTATION
<br />OWNER: HENOK HAILE
<br />1. THESE GENERAL NOTES PERTAIN TO WORK DESCRIBED ON ALL CONTRACT 1504 50TH ST,�t✓ERET, 98203
<br />DOCUMENTS. WOOD FIIAMING $9
<br />2. THE CONTRACT DOCUMENTS CONSIST OF THE OWNER CONTRACTOR --�- NOWHAPFIaN (THROUCH MEMBER: ASPHALT DESIGNER: ERMIAS KOUT
<br />AGREEMENT, THE CONDITIONS OF CONTRACT (GENERAL, SUPPLEMENTARY, F—D 'NOODFRAMING eMD design practice
<br />TINSULATION BAS
<br />AND OTHER CONDITIONS), THE DRAWINGS, THE SPECIFICATIONS, AND ALL � PwDPEarr (Ir�rERRUP�ED�iEh!BER;, emd.designpractice@gmail.com
<br />ADDENDA ISSUED PRIOR TO AND ALL MODIFICATIONS ISSUED AFTER FF CORNER +Qe a,� CEIL 4HEr iff BRICK
<br />EXECUTION OF THE CONTRACT. �.-4 SPOT ELEVA ION PROPERTY INFO
<br />3. eMD IS THE AUTHOR OF THESE PLANS AND CLAIMS A COPYRIGHT IN THESE LPOELELEVATION 'r 2 ROOF SLOPE CMUBLOCK
<br />PLANS AND THE DESIGNS CONTAINED IN THESE PLANS THIS CLAIM IS MADE
<br />UNDER TITLE 17 OF THE UNITED STATES CODE AND ALL APPLICABLE TREATIES
<br />�
<br />w SLOPE
<br />ROOFSLOPEPLAN� CONCRETE
<br />AND FOREIGN LAWS. THESE COPYRIGHTED DRAWING FILES ARE TO BE USED
<br />��1'!,
<br />)L
<br />BIUILDINGSEC-ION _ ";
<br />DOORSYMBOL Ea.Fs.
<br />FOR REFERENCE ONLY. eMD WILL TAKE NO RESPONSIBILITY FOR ANY.
<br />i
<br />CUT
<br />A
<br />-7T�
<br />CHANGES MADE TO THESE DOCUMENTS BY ANOTHER PARTY AND NO LICENSE IS
<br />aVINOSriNSYMBCL GrADE='EARTH
<br />1 I•t--I�-T1
<br />GIVEN FOR TRANSFER OF THESE COPYRIGHTS TO ANOTHER PARTY.
<br />4. THE WORK COMPRISES THE COMPLETED CONSTRUCTION REQUIRED BY THE
<br />r r�
<br />WALL SECTION CUT
<br />AaEMRYseraEOL GRN.IEL
<br />ADDRESS:
<br />1504 50TH ST IS
<br />EVERETT, WA 98203
<br />APN:
<br />00386300000500
<br />LOT:
<br />5&6
<br />ZONE:
<br />R-1
<br />CONTRACT DOCUMENTS AND INCLUDES ALL LABOR NECESSARY TO PRODUCE SUCH
<br />CONSTRUCTION, AND ALL MATERIALS AND EQUIPMENT INCORPORATED OR TO
<br />ti
<br />r___ra--�, '
<br />DETAILCALLOUT �
<br />PPCOSED
<br />CONTOUR LINE
<br />- -- -'—�-- GYPSUM BOARD
<br />BE INCORPORATED IN SUCH CONSTRUCTION.
<br />9 J
<br />rz
<br />EAS71NG
<br />GYPSUM ShEATHING
<br />5. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES ARE NOT A PART OF THE
<br />CON -,OUR LINE
<br />ORIEI4TEASTPANO
<br />SHEET INDEX
<br />r- - ---- --_
<br />CONTRACT DOCUMENTS. THE DESIGNER WILL REVIEW THEM, BUT ONLY FOR
<br />..1
<br />PROPEAT+LINE
<br />BOARD
<br />=' =.
<br />CONFORMANCE WITH THE DESIGN CONCEPT OF THE WORK AND WITH THE
<br />I <A9' �4 ELEVATION BUBBLE A PLnVOOOSHEATHING
<br />INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. THE CONTRACTOR
<br />'ti/
<br />��
<br />B
<br />MVCH LINE
<br />A0.1 TITLE SHEET
<br />SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR ANY DEVIATION FROM THE
<br />NAA4E
<br />—.— __
<br />CENTERLINE
<br />Rr.IDINSULATION
<br />A1.0 SITE
<br />REQUIREMENTS OF THE CONTRACT DOCUMENTS BY THE DESIGNER REVIEW OF
<br />:-..:--.: •. SAND ,thOPtiER+
<br />A2.1 FLOOR PLAN
<br />SHOP DRAWINGS, PRODUCT DATA OR SAMPLES.
<br />NUMBER --PHH —
<br />PHor,ELINE
<br />•
<br />=• • = PLASTER
<br />A3.1 ELEVATION
<br />-- - - -- _
<br />6. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT
<br />REVISION CLOUD $
<br />GAS LINE
<br />STEEL
<br />DOCUMENTS AND SHALL AT ONCE REPORT TO THE DESIGNER ANY ERROR,
<br />7 ,
<br />-G-G -
<br />NUMBER
<br />�`
<br />INCONSISTENCY OR OMISSIONS HE MAY DISCOVER. THE CONTRACTOR
<br />ChANGE NFLOOR - E -.E -
<br />ELECTRICALUNE
<br />T 5'ONE
<br />---
<br />SHALL PERFORM NO PORTION OF THE WORK AT ANY TIME WITHOUT
<br />71E CARPE
<br />.F--ir —•
<br />NIA-ERIAL
<br />CONTRACT DOCUMENTS OR, WHERE REQUIRED, APPROVED SHOP DRAWINGS,
<br />—x —x —
<br />FENCE LINE
<br />T— TEC-U+�
<br />PRODUCT DATA OR SAMPLES FOR SUCH PORTION OF THE WORK.
<br />T'S
<br />SEWER
<br />'-^= � WOOD FINISH
<br />7. ALL WORK IS TO CONFORM WITH THE CONTRACT DOCUMENTS.
<br />r
<br />sANr-Aw
<br />CODES
<br />DRAWINGS ARE NOT TO BE SCALED FOR INFORMATION IF UNABLE TO
<br />LOCATE DIMENSIONS FOR ANY ITEM OF WORK, CONSULT WITH THE
<br />+ —GRID
<br />LINE' —4 __
<br />'ELP11SrONLINE
<br />GLass
<br />DESIGNER BEFORE PROCEEDING WITH CONSTRUCTION,
<br />I
<br />—sv—v.—
<br />WATERLINE
<br />BASED ON THE 2015 I.R.C, 2015 UPC, 2015 WA
<br />8. IN THE EVENT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY
<br />STATE ENERGY CODE, AND 2015 WA STATE
<br />SHOWN ON THE CONTRACT DOCUMENTS, THEN THEIR CONSTRUCTION SHALL BE
<br />AMENDMENTS
<br />OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN
<br />OR CALLED FOR AND SHALL BE REVIEWED BY THE DESIGNER,
<br />9. ALL WORK SHALL BE PERFORMED WITHIN STRICT CONFORMANCE TO THE
<br />MINIMUM STANDARDS OF THE CURRENT EDITION OF THE INTERNATIONAL
<br />BUILDING CODE AND ALL APPLICABLE NATIONAL, STATE, AND LOCAL LAWS,
<br />REGULATIONS AND ORDINANCES.
<br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL SAFETY
<br />DURING CONSTRUCTION, AND ALL WORK SHALL CONFORM TO PERTINENT
<br />SAFETY REGULATIONS.
<br />11. THE CONTRACTOR SHALL COORDINATE LOCATIONS OF ANY AND ALL
<br />MECHANICAL, TELEPHONE, ELECTRICAL, LIGHTING AND PLUMBING INCLUDING
<br />ALL PIPING, DUCT WORK AND CONDUIT. COORDINATE ALL REQUIRED
<br />CLEARANCES FOR INSTALLATION AND MAINTENANCE OF THE ABOVE
<br />EQUIPMENT.
<br />12. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING HIS/HER
<br />BEST SKILL AND ATTENTION, HE/SHE SHALL BE SOLELY RESPONSIBLE FOR ALL
<br />CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES
<br />AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE
<br />CONTRACT.
<br />13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACTS AND OMISSIONS
<br />OF HIS/HER EMPLOYEES, SUBCONTRACTORS AND THEIR AGENTS AND
<br />EMPLOYEES, AND OTHER PERSONS PERFORMING ANY WORK UNDER A
<br />CONTRACT WITH THE CONTRACTOR.
<br />14. THE CONTRACTOR SHALL PURSUE WORK IN A CONTINUOUS AND DILIGENT
<br />MANNER TO INSURE TIMELY COMPLETION OF THE PROJECT.
<br />15. THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES FREE FROM
<br />ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY HIS/HER
<br />OPERATIONS. AT THE COMPLETION OF THE WORK, HE/SHE SHALL REMOVE
<br />ALL HIS/HER WASTE MATERIALS AND RUBBISH FROM AND ABOUT THE PROJECT
<br />AS WELL AS ALL HIS/HER TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY,
<br />AND SURPLUS MATERIALS.
<br />16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND/OR
<br />PROTECTION OF ALL EXISTING AND PROPOSED PIPING, UTILITIES,
<br />STRUCTURES, ADJACENT STREETS, AND IMPROVEMENTS DURING THE PERIOD OF
<br />CONSTRUCTION,
<br />17. UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, THE
<br />CONTRACTOR SHALL PROVIDE AND PAY FOR ALL LABOR, MATERIAL,
<br />EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY, WATER,
<br />HEAT, UTILITIES, TRANSPORTATION, AND OTHER FACILITIES AND SERVICES
<br />NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
<br />18. WHERE CONFLICTS OCCUR, COORDINATE THE LAYOUT AND EXACT
<br />LOCATION OF ALL PARTITIONS, DOORS, TELEPHONES AND
<br />ELECTRICAUCOMMUNICATION OUTLETS AND SWITCHES WITH DESIGNER IN
<br />THE FIELD BEFORE PROCEEDING WITH CONSTRUCTION.
<br />19. WHERE CONFLICT IS ENCOUNTERED BETWEEN THE CONTRACT DOCUMENTS
<br />THAT WILL MATERIALLY AFFECT THE QUALITY OR EXTENT OF THE WORK,
<br />SUCH CONFLICT SHALL BE RESOLVED TO THE SATISFACTION OF THE DESIGNER
<br />BEFORE THE AFFECTED ITEMS AND/OR MATERIALS ARE PURCHASED, FABRICATED
<br />AND/OR INSTALLED.
<br />20. WHERE PRE MANUFACTURED OR PREFABRICATED ITEMS AND/OR MATERIALS
<br />ARE TO BE INSTALLED -THE CONTRACTOR SHALL VERIPY ROUGH OR FINISHED
<br />DIMENSIONS IN THE FIELD PRIOR TO PURCHASE OR FABRICATION.
<br />21 THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS TO BE
<br />FREE FROM DEFECTS FOR A MINIMUM OF ONE YEAR FROM DATE OF FINAL
<br />ACCEPTANCE, AND PROMPTLY REMEDY SUCH DEFECTS AND ANY SUBSEQUENT
<br />DAMAGE CAUSED BY THE DEFECTS OR REPAIR THEREOF, AT NO EXPENSE TO
<br />THE OWNER. GUARANTEE PERIODS OF GREATER THAN ONE YEAR MAY BE
<br />REQUIRED AND CONTAINED WITHIN THE CONTRACT DOCUMENTS.
<br />22. UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS THE
<br />CONTRACTOR SHALL SECURE AND PAY FOR THE BUILDING PERMIT AND FOR ALL
<br />OTHER PERMITS AND GOVERNMENTAL FEES, LICENSES AND INSPECTIONS
<br />NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
<br />23. WHERE ANY ITEM AND/OR MATERIAL IS INDICATED IN THE CONTRACT
<br />DOCUMENTS, AND NOT NECESSARILY DETAILED IN EACH SPECIFIC CASE, BUT IS
<br />REQUIRED FOR A COMPLETE AND PROFESSIONAL INSTALLATION SUCH ITEM
<br />AND/OR MATERIAL SHALL BE PROVIDED AS IF SHOWN AND DETAILED IN FULL.
<br />PROVIDE MEANS TO FURNISH AND INSTALL,
<br />AS J51 ems- rZe-- s8C 93 2S. J (uA c)
<br />APPROVED
<br />PLANNING & COMMUNITY
<br />DEVELOPMENT DEPT.
<br />13Y I'
<br />OT2.
<br />OCCUPANCY GROUP
<br />R
<br />CONSTRUCTION TYPE
<br />VB
<br />FLOOR AREA (SF) LIVING GARAGE
<br />EXISTING UPPER LEVEL 2,722SF I
<br />EXISTING ATTCHED GARAGE 576SF
<br />TOTAL LIVING AREA 2,722SF 576SF
<br />REQUIRED SEPARATION
<br />NO
<br />#OF STORIES
<br />1
<br />FULLY SPRINKLERED
<br />NO
<br />PROJECT DESCRIPTION
<br />INSTALL GRAB BARS IN EXIST. BATHROOMS
<br />�AUTLJING NEW CONC. WALK WAY
<br />VICINITY MAP
<br />PROJECT LOCATION
<br />0,
<br />M
<br />LL
<br />w
<br />Z
<br />V
<br />O
<br />z
<br />Lu
<br />Permit#:
<br />B2006-014
<br />Site Address:
<br />1-504 50TH ST
<br />Owner:
<br />YESHEWAERGET HENOK & HAILE ZELEKA A
<br />Tenant:
<br />[Ten Name]
<br />App.Date:
<br />6/12/2020
<br />Proposed Use:
<br />SFR DETACHED
<br />Description:
<br />ADD NEW SLOPED CONCRETE WALKWAY,
<br />GRAB BARS IN MASTER BATHRM
<br />Reviewed By:
<br />Date:
<br />041ofFice Set
<br />loin Site Set Fire/Planning Set
<br />C)
<br />N
<br />00
<br />Q
<br />I—
<br />I—
<br />�W
<br />rr
<br />WW
<br />W
<br />W�
<br />F_
<br />L0
<br />qqd-
<br />L0
<br />T
<br />_ W
<br />Everett
<br />U
<br />COO
<br />Oz
<br />0 0h5E U Ln >
<br />w
<br />C
<br />7
<br />rz
<br />LU
<br />n v0
<br />\J J
<br />W
<br />0 0_
<br />■ 0
<br />I z o 0
<br />w
<br />w
<br />m o
<br />CITY OF EVERETT
<br />REVIEWED FOR PERMIT
<br />u25
<br />4 2020
<br />"I T Y
<br />'err. it Service
<br />r-O
<br />
|