NE 114, SW 1 ., R.5E, <br />CITY OF EVERETT, WASHINGTON <br />SOIL RETENTION., <br />THE DUFF LAYER AND NATIVE TOPSOIL SHOULD BE RETAINED IN AN UNDISTURBED STATE <br />TO THE MAXIMUM EXTENT PRACTICABLE. IN ANY AREAS REQUIRING GRADING REMOVE AND <br />STOCKPILE THE DUFF LAYER AND TOPSOIL ON SITE IN A DESIGNATED, CONTROLLED AREA, <br />NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS, TO BE REAPPLIED TO OTHER <br />POR77ONS OF THE SITE WHERE FEASIBLE. <br />SOIL QUALITY.• <br />THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE <br />ESTABLISHED. ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN <br />COVERED BY IMPERVIOUS SURFACE, INCORPORATED INTO A DRAINAGE FACILITY OR <br />ENGINEERED AS STRUCTURAL FILL OR SLOPE SHALL, AT PROJECT COMPLETION, <br />DEMONSTRATE THE FOLLOWING: <br />1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF TEN PERCENT <br />DRY WEIGHT IN PLANTING BEDS, AND 51-� ORGANIC MATTER CONTENT (BASED ON A <br />LOSS -ON -IGNITION TEST) IN TURF AREAS, AND A PH FROM 6.0 TO 8.0 OR <br />MATCHING THE PH OF THE ORIGINAL UNDISTURBED SOIL, THE TOPSOIL LAYER SHALL <br />HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LIMIT THE <br />DEPTH OF INCORPORATION OF AMENDMENTS NEEDED TO MEET THE CRITERIA. <br />SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES <br />WITH SOME INCORPORATION OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, <br />WHERE FEASIBLE. <br />2. PLANTING BEDS MUST BE MULCHED WITH 2 INCHES OF ORGANIC MATERIAL. <br />3. QUALITY OF COMPOST AND OTHER MATERIALS USED TO MEET THE ORGANIC CONTENT <br />REQUIREMENTS. <br />A. THE ORGANIC CONTENT FOR PRE-APPROVED°.AMENDMENT RATES CAN BE MET <br />ONLY USING COMPOST MEETING THE COMPOST SPECIFICATION FOR <br />BIORETENTION (BMP T7.30), WITH THE EXCEPTION THAT THE COMPOST MAY <br />HAVE UP TO 357. BIOSOLIDS OR MANURE <br />B. COMPOST USED IN BIORETENTION AREAS SHOULD BE STABLE, MATURE AND <br />DERIVED FROM YARD DEBRIS, WOOD WASTE, OR OTHER ORGANIC MATERIALS <br />THAT MEET THE INTENT OF THE ORGANIC SOIL AMENDMENT SPECIFICATION. <br />BIOSOLIDS AND MANURE COMPOSTS CAN BE HIGHER IN BIOAVAILABLE <br />PHOSPHORUS THAN COMPOST DERIVED FROM YARD OR PLANT WASTE AND <br />THEREFORE ARE NOT ALLOWED IN BIORETENTION AREAS DUE TO THE <br />POSSIBILITY OF EXPORTING BIO-AVAILABLE PHOSPHORUS IN EFFLUENT. <br />C. THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 357. TO <br />65%, AND A CARBON TO NITROGEN RATIO BELOW 25:1. <br />D. THE CARBON TO NITROGEN RATIO MAY BE AS HIGH AS 35: 1 FOR PLANTINGS <br />COMPOSED ENTIRELY OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS <br />REGION <br />CALCULATED AMENDMENT RATES MAY BE MET THROUGH USE OF COMPOSTED <br />MATERIAL MEETING THE REQUIREMENTS ABOVE; OR OTHER ORGANIC MATERIALS <br />AMENDED TO MEET" THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT <br />EXCEEDING THE CONTAMINANT LIMITS IDENTIFIED IN TABLE 220-B, TESTING <br />PARAMETERS, IN WAC 173-350-220. <br />IMPLEMENTATION OPTIONS: <br />THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE CAN BE MET BY USING ONE OF THE <br />METHODS LISTED BELOW. <br />1. LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION <br />DURING CONSTRUCTION. <br />2. AMEND DISTURBED SOIL ACCORDING TO THE FOLLOWING PROCEDURES: <br />A. SCARIFY SUBSOIL TO A DEPTH OF ONE FOOT. <br />B. IN PLANTING BEDS, PLACE THREE INCHES OF COMPOST AND TILL IN TO AN <br />EIGHT -INCH DEPTH. <br />C. IN TURF AREAS, PLACE TWO INCHES OF COMPOST AND TILL IN TO AN <br />EIGHT -INCH DEPTH. <br />D. APPLY TWO TO FOUR INCHES OF ARBORIST WOOD CHIP, COARSE BARK MULCH, <br />OR COMPOST MULCH TO PLANTING BEDS AFTER FINAL PLANTING. <br />3. AMEND ON A SITE -CUSTOMIZED MANNER SO THAT IT MEETS THE SOIL QUALITY <br />CRITERIA SET FORTH ABOVE, AS DETERMINED BY A LICENSED ENGINEER, GEOLOGIST, <br />LANDSCAPE ARCHITECT, OR OTHER PERSON AS APPROVED BY SNOHOMISH COUNTY. <br />4. STOCKPILE EXISTING TOPSOIL DURING GRADING, AND REPLACE IT PRIOR TO PLANTING. <br />STOCKPILED TOPSOIL MUST BE AMENDED IF NEEDED TO MEET THE ORGANIC MATTER <br />AND DEPTH REQUIREMENTS BY FOLLOWING THE PROCEDURES IN THE PREVIOUS <br />BULLET <br />5. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEET THE <br />ORGANIC MATTER AND DEPTH REQUIREMENTS. <br />MORE THAN ONE METHOD MAY BE USED ON DIFFERENT PORTIONS OF THE SAME SITE. <br />SOIL THAT ALREADY MEETS THE DEPTH AND ORGANIC MATTER QUALITY STANDARDS, AND <br />IS NOT COMPACTED, DOES NOT NEED TO BE AMENDED. <br />MAINTENANCE <br />1, SOIL QUALITY AND DEPTH SHOULD BE ESTABLISHED TOWARD THE END OF <br />CONSTRUCTION AND, ONCE ESTABLISHED, SHOULD BE PROTECTED FROM COMPACTION, <br />SUCH AS FROM LARGE MACHINERY USE, AND FROM EROSION. <br />2. SOIL SHOULD BE PLANTED AND MULCHED AFTER INSTALLATION. <br />3. PLANT DEBRIS OR ITS EQUIVALENT SHOULD BE LEFT ON THE SOIL SURFACE TO <br />REPLENISH ORGANIC MATTER. <br />SOIL "ENDMElff LEGEND <br />UNDISTURBED SOIL <br />AMENDED SOILS <br />OIL TEST PIT L0GS- <br />TEST PIT 1 (TP-1) <br />0"-12": TOP SOIL <br />12"-48": LIGHT BROWN LOOSE TO MEDIUM -DENSE SLIGHTLY SILTY FINE SAND <br />48'-108°: LIGHT GRAY MEDIUM -DENSE SLIGHTLY SILTY FINE SAND (ADVANCE OUTWASH) <br />> 1051. TEST PIT TEMINIATED AT 9.0 FEET <br />TEST PIT 2 (T P-2) <br />0"-12": TOP SOIL <br />12"-36": LIGHT BROWN LOOSE TO MEDIUM -DENSE SLIGHTLY SILTY FINE SAND <br />36"-96": LIGHT GRAY DENSE FINE SAND. (ADVANCE OUTWASH) <br />>96": TEST PIT TEMINIATED AT 8.0 FEET <br />TEST PIT 3 aE-3) <br />0"-12": TOP SOIL <br />12"-66": LIGHT BROWN LOOSE TO MEDIUM -DENSE SILTY FINE SAND <br />66"-120": LIGHT GRAY DENSE SLIGHTLY SILTY FINE SAND (ADVANCE OUTWASH) <br />> 12D': TEST PIT TEIROItN'9ATED AT 10.0 FEET <br />TEST PIT 4�(TP-4) <br />0'-12 TOP SOIL <br />12"-36": BROPYN LOOSE TO MEDIUM -DENSE SILTY FINE SAND <br />36"-96 LIGHT BROWN DENSE SLIGHTLY SILTY FINE SAND (ADVANCE OUTWASH) <br />>96": TEST PIT TEMINIATED AT 8.0 FEET <br />TEST PIT 5`TP-5,� <br />0"-12": TOP SOIL <br />12"- : LIGHT BROWN LOOSE TO MEDIUM -DENSE SILTY FINE SAND <br />48"-102'. LIGHT GRAY DENSE SLIGHTLY FINE TO MEDIUM SAND (ADVANCE OUTWASH) <br />> 102": TEST PIT TEMINIATED AT 8.5 FEET <br />7EST P T TP6) <br />0"-8": TOP SOIL <br />8"-421: BROWN TO LIGHT BROWN LOOSE TO MEDIUM -DENSE SLIGHTLY SILTY FINE SAND <br />42"-96": LIGHT GRAY DENSE FINE TO MEDIUM SAND (ADVANCE OUTWASH) <br />>96": TEST PIT TEMIN14TED AT 8.0 FEET <br />SURFACE AREA DETERMINED <br />AT TOP OF WEIR 4' MIN. <br />1' MIN. OVERFLOW <br />1' MIN. <br />I' MIN. <br />ry. <br />y 3.5'-5' <br />T1-5�MIN. <br />FLAT BOTTOM <br />314"-1.5" <br />WASHED GRAVEL <br />RIPRAP <br />2" <br />TO 4" ROCK <br />GEOTEA71LE <br />TYPICAL CROSS SECTION <br />DISCHARGE TO STABILIZED <br />CONVEYANCE, OUTLET OR <br />SMIMNiT TW,MOE <br />LEVEL SPREADER <br />NEW DETENTION PIPE SYSTEM MAY BE <br />USED AS A TEMPORARY SEDIMENT TANK, <br />- 6'. MIN, <br />-� <br />UPON CITY APPROVAL, DURING <br />CONSTRUCTION PROVIDED SYSTEM DOES rr-rr=rr-� <br />NOT OUTLET INTO NEW SEWER SYSTEM I I=III=III= <br />III <br />I' MIN. DEPTH OVERFLOW SPILLWAY <br />AND DETENTION SYSTEM IS FLUSHED AND. <br />-I 11= <br />11= <br />IF <br />CLEANED PRIOR TO USE. <br />I I <br />�) <br />I <br />NATIVE SOIL OR <br />I <br />v;.:•.'"a.,...°, <br />! MIN. 1 ' DEPTH <br />- '.. ` :::'.:'':", -:.•.:�....,;.. :: <br />COMPACTED BACKFILL <br />-I (-�''.. •: I- <br />,I_III-:: '::` : ~`: ::'' - <br />2" TO 4" ROCK <br />MIN. I' DEPTH <br />GEOTEXTILE <br />a" TO 1.5" <br />TRAP OUTLET <br />WASHED GRAVEL <br />7'E' O S D.M -TRAP DETAIL <br />PER DOE BMP C240 <br />SEDIMENTTW CAL C. <br />2-YEAR PEAK RUNOFF RATE = 0.122 CFS. <br />FS (FACTOR OF SAFETY) = 2 <br />Vs (SETTLING VELOCITY) = 0.00096 FT/SEC. <br />SURFACE AREA REQUIRED = 254 SF <br />DESIGNED SURFACE AREA = 484 SF. <br />SPILLWAY = 262.0 <br />TOP = 261.0 <br />TOE = 257.5 <br />EX. SSCO <br />EX. CB <br />INLET RIM 258.30 <br />9 <br />EX. SDMH <br />RIM 258 03 <br />IE 8" N 253.1 <br />EX. CB I <br />INSTALL CATCH BASIN <br />SEDIMENT INSERTS <br />260 - - - <br />CAL.0 <br />26 <br />-- ` - - 2 4 <br />TEMPORARY <br />SEDIMENT TRAP <br />- TP 5 <br />PER DOE BMP <br />- 7 26 - <br />- - C240 <br />S,01 7 O.TE ° <br />_ <br />NEW DETENTION PIPE SYSTEM MAY BE <br />26 <br />USED AS A TEMPORARY SEDIMENT TANK, <br />UPON CITY APPROVAL, DURING <br />CONSTRUCTION PROVIDED SYSTEM DOES <br />270 <br />_ <br />NOT OUTLET INTO NEW SEWER SYSTEM <br />i \ o <br />AND DETENTION SYSTEM IS FLUSHED AND <br />LOT 2 ' <br />_ \ o <br />CLEANED PRIOR TO USE. <br />4 72 <br />n <br />O <br />27 <br />Q ` o <br />N <br />D_ <br />o <br />Ld <br />_ _ _ 276 <br />278 <br />o• <br />�14 FENCE <br />282 <br />- - <br />f I <br />254 <br />286 - 1 4 HOUSE <br />JSE #812 1 <br />_ \\ <br />S 87'3557" <br />16, 00' <br />00472900000401 <br />0 <br />LEGEND <br />i <br />RIGHT-OF-WAY CENTER LINE <br />PROPERTY LINE <br />- -�- <br />RIGHT OF WAY <br />- - <br />EXISTING LOT LINES <br />❑HP - <br />EXISTING POWER (AERIAL) <br />-SS Cam- <br />EXISTING SANITARY SEWER <br />Z S D <br />EXISTING STORM DRAIN <br />- - -- - <br />EXIS77NG CONTOURS <br />/7777, <br />EX. EDGE OF PAVEMENT <br />L1 <br />EXISTING CATCH BASIN (CB) <br />© <br />EXISTING STORM MANHOLE (SDMH) <br />0 <br />EXISTING SEWER MANHOLE (SSMH) <br />tit <br />EX. FIRE HYDRANT <br />FE <br />EX. WATER METER <br />-C�- <br />EX. POWER POLE <br />E---- <br />EX. UTILITY POLE ANCHOR <br />EXISTING CONCRETE <br />EXISTING ADJACENT BUILDING <br />' PPLEGEN <br />XXX <br />PROPOSED CONTOUR LINE <br />CLEARING LIMITS PER DOE BMP C 103 <br />MULCH &IOR STRAW MATTING <br />PER DOE BMP C121 <br />PRESERVE NATIVE VEGETATION <br />PER DOE BMP C101 <br />SF <br />SILT FENCE PER COE STD DWG #214 <br />- <br />TEMPORARY CONSTRUCTION ENTRANCE <br />PER COE STD DWG J201 <br />ZIT <br />INTERCEPTOR TRENCH WITH DIKES <br />co <br />> <br />PER DOE BMP C200 <br />ss#19® 01 <br />REVIEWED FOR PERMIT <br />