Laserfiche WebLink
NMI <br />a W I <br />a T-1 I <br />� j - SEE NOTE EX. UN\ I 5 I HLt�A I I11N EUr <br />\!,3 <br />\f <br />'ORIyI Wt TEF SYST MSIDEWALK AND D W V) - : CONCRETE/ 4APRON TO BE >� N89 59 42 W 258.09 , <br />REPLACED PER �COE DET. 317 >, t <br />E N89"59 42 ,W 128.81 o a--x i p <br />1000 <br />01) <br />„ . <br />J� i i <br />1�.X. P�vEMENT � .� �; .� -�-- I --� <br />2 <br />a <br />i <br />I <br />APPROX. <br />Epp cc,,,,5� OE .. - 'a---i•-< ,:. —•-- •--- ` . ' +•_ate � ^ .. . <br />a <br />, <br />D � l <br />i <br />f <br />tE <br />t 1 4 <br />, <br />t <br />ref 1 <br />u <br />, <br />, I r ,'"j ~,.J^° �% :-•—, ,s +'°�i ' � 1. ,r <br />I N89 59 42 W 1 8..,` , r, � c4 <br />EX. 70' u7 r,F G I O: <br />t <br />ROW <br />� 4. SILT FENCE t t g <br />- 1 O t£ <br />is t t I i O <br />f I ,F'ER COE STD. I _ 1 <br />f o ; x a IEX. FLOW <br />o l• �: _ r DET. 214 o _� N <br />i k j{ r- ARROW <br />j <br />- ; I _ t o <br />t w, <br />a <br />LxE (� i F '. .,.-,«..._-- ....,...,..-.,....w.-......_.,.,,.....mow................ ,.-.,._..,.-... ..,.....,...,.......-. - <br />O. <br />t <br />'EX. SHED <br />APP <br />ROX' 1_ 0OI <br />I EX. BLDG L.X. SIDE SEWR <br />0 20 40 <br />- .. — . —. . _ . — . . — . .____. <br />HORIZONTAL SCALE <br />GRADING QUANTITIES: <br />Know what's below. -- ., c:uN rcuc err t�v g tcNct:t <br />ROCK PACE <br />Call two business DRAY ? <br />CAE 5td Dw <br />days before you dig. <br />EROSION <br />1. <br />A SMWO rA noN CONTRO NOM <br />APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN <br />DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR <br />DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, <br />TOPSOIL/STOCK PILE NOTE: <br />RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). <br />PILES ARE TO BE COVERED W/ <br />2. <br />THE IMPLEMENTATION OF THESE ESC PLANS AND THE <br />PLASTIC SHEETING WITHIN 24 HOURS. <br />CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF <br />THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />CONTRACTOR TO INSTALL SILT <br />APPLICANT/CONTRACTOR .UNTIL ALL CONSTRUCTION 1S COMPLETED <br />FENCING WHERE NECESSARY ALONG <br />AND APPROVED AND ,VEGETATION/LANDSCAPING IS ESTABLISHED. <br />PERIMETER IF VEGETATIVE BUFFER <br />3. <br />THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN <br />DOES NOT PROVIDE ADEQUATE <br />PROTECTION. <br />SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. <br />DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE <br />FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING <br />SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE <br />DURATION OF CONSTRUCTION. <br />4. <br />THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED <br />IN CONJUNCT70N WITH ALL CLEARING AND GRADING ACTIVITIES, AND <br />IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT <br />LADEN WATER DO NOT ENTER. THE DRAINAGE SYSTEM, ROADWAYS, <br />OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />5. <br />THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED <br />AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br />SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />- <br />6. <br />THE ESC. FACIL177ES SHALL BE INSPECTED ROUTINELY AND <br />MAINTAINED BY THE APPLICANT/CONTRACTOR TO. ENSURE THEIR <br />CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br />Z <br />THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND <br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 <br />HOURS FOLLOWING A MAJOR STORM EVENT. <br />8. <br />AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE <br />ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL <br />CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR <br />TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT <br />- <br />LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />9. <br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE <br />BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION <br />OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO <br />ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE <br />DURATION OF THE PROJECT. <br />10. <br />THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO <br />- -- <br />REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br />11. <br />APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM <br />ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL <br />12. <br />BARE _AND/OR DISTURBED , SOILS SHALL REMAIN UNCOVERED AND/OR <br />UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 <br />THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 <br />THROUGH SEPTEMBER 30. <br />>cma000) <br />Q 00 'rf; <br />0 OS cy <br />LO LO , <br />W W d. <br />sm <br />W <br />r W <br />04 <br />C� <br />z <br />C9 <br />Z <br />W� <br />LU <br />Z <br />a� <br />Z <br />Uj <br />W z <br />> 0 <br />Q z <br />x U) <br />Q <br />W <br />W ...t �. <br />prole I" <br />> LL <br />W <br />W <br />W <br />Z C) W <br />UL <br />ry <br />V U <br />a- <br />z� <br />o <br />W <br />M <br />LO <br />z <br />O <br />W <br />O <br />U <br />Z <br />W <br />LL <br />= <br />O <br />Z <br />O <br />O <br />Z <br />IxN <br />CL <br />PROJ. NO. DSN. BY: <br />18-1001 MR <br />DATE: <br />1/16/19 <br />SCALE: <br />.1 " 20' <br />DRAWING NO. <br />2 OF 5 <br />