Laserfiche WebLink
9 <br />', <br />ENERAL ROAD AND STORM <br />GENERAL WA TER N 0 TES. <br />1. <br />ALL. WORK AND: MATERIALS SHALL CONFORM TO CITY OE EVERETT STANDARDS AND/bR <br />WSDOT/ APWA STANDARD SPECIFICATIONS AS APPLICABLE. <br />-NO CONNECTIONS TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN <br />� <br />APPROVED BACKFLOW PREVENTION DEVICE PRIOR TO SATISFACTORY FLUSHING, TESTING, <br />�? <br />Z <br />THE 'CONTRACTOR SHALL NOTIFY OMEGA ENGINEERING 'INC., THE OWNER AND THE <br />DISINFECTION, AND RECEIPT OF SATISFACTORY BACTERIOLOGICAL TEST RESULTS. <br />INSPECTOR WHENCONFLICTS BETWEEN THE PLANS AND EXISTING FIELD CONDITIONS OCCUR, <br />CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE CITY UTILITIES <br />AND SAID CONFLICTS SHALL BE 'RESOLVED' PRIOR TO PROCEEDING CONSTRUCTION, <br />DEPARTMENT AT THE DEVELOPER'S EXPENSE, THE CITY UTILITIES DEPARTMENT SHALL BE <br />3. <br />NO DART OF THE DRAINAGE SYSTE SHALL BE COVERED., CONCEALED OR PUT INTO USE <br />GIVEN AT LEAST 5, BUSINESS DAYS NOTICE FOR EACH CONNECTION. THE CITY UTILITIES <br />UNTIL IT HAS BEEN TESTED, INSPECTED AND ACCEPTED BY THE CITY, <br />DEPARTMENT SHALL THEREAFTER DETERMINE THE DATE AND TIME AT WHCIH THE CONNECTION <br />SHALE. BE MADE; <br />®®.®.®®®® <br />4. <br />APPROXIMATE LOCATIONS OF EXISTING. UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE <br />too <br />RECORDS AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR 'SHALL BE RESPONSIBLE <br />ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS. <br />N � <br />FOR VERIFICATIONOF 'LOCATION AND TO :AVOID DAMAGE. TO ANY ADDITIONAL UTILITIES NOT <br />;® <br />`SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING:CONSTRUCTION THE <br />A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF <br />°aaso <br />CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTORAND ANY CHANGES REQUIRED <br />CONSTRUCTION.THE CITY OF EVERETT PUBLIC WORKS INSPECTION DIVISION MUST BE. NOTIFIED <br />C< <br />m® <br />I' <br />I=1A.L B APPROVED BY THE CITY.ENGINEER PRIER TO COMMENCEMENT OF RELATED <br />AT LEAST 4 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. <br />CONSTRUCTION ON THE PROJECT: <br />THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFY THE CITY UTILITIES <br />. <br />ALL STORM DRAIN WORK MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO <br />DEPARTMENT OF A PERSON WHO CAN. BE CONTACTED REGARDING PROBLEMS DURING <br />STARTING CONSTRUCTION. <br />CONSTRUCTION ON A 24 HOUR BASIS. <br />6. <br />ALL CB9 - SHALL' BE TYPE A PER STD. DWG. 4.02 UNLESS .OTHERWISE SHOWN. <br />MAINTAIN. A.' MINIMUM OF. 10-FEET HORIZONTAL AND 18-INCHES VERTICAL SEPARATION 13ETWEEN <br />POTABLE AND NON -POTABLE CONVEYANCE SYSTEMS. <br />i. <br />ALL.. STORM DRAIN PIPE SHALL BE CORRUGATED HIGH DENSITY POLYETHYLENEPIPE WITHSMOOTH <br />: WALL INTERIOR UNLESS- OTHERWISE NOTED, <br />ALL CITY OFEVERETT VALVES SHALL BE OPERATED BY CITY UTILITIES DEPARTMENT. PERSONNEL <br />. <br />ALL EXPOSED GROUND MUST BE. RESEEDED WITHIN 30 DAYS. OF THE COMPLETION OF <br />ONLY.. ALL VALVES, NEW AND EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES. <br />CONSTRUCTION. IF RESEEDING IS NOT _PRACTICAL DUE,TO -TIME WEATHER OIL SEASONAL <br />PROBLEMS, THE GROUND MUST CO HERED : MITH MULCH AS, DIRECTED BY THE CITY <br />.BE <br />ENGINEER. <br />SA N1 TA R Y SEWER NO TES. <br />. <br />CITY STREETS ARE TO BE KEPT CLEAR OF DIRT AND DEBRIS AT ALL TIMES DURING <br />A: ALL MCRIC AND v49ATEPIALS SHALL CONrF ORM TOTHE CITY OF EVERETT STANDARDSANDCONSTRUCTION. <br />DUST SUPPRESSION ,AND STREET CLEANING MUST OCCUR AS DIRECTED BY <br />SD0TIAPWA STANDARD SPECIFICATIONS <br />THE. PUBLIC WORKS INSPECTOR. <br />- <br />SNO PART` OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, CONCEALED OR PUT <br />1O. <br />PARKING IS ALLOWED ONLY IN DESIGNATED PARKING AREAS. <br />IA170 USE UNTIL IT HAS PEEN . TESTED, INSPECTED, AND APPROVED SY THE CITY <br />11. <br />IN ENCOUNTERED, ANY EXISTING ON --SITE .SEWAGE SYSTEMS MUST BE ABANDONED AND <br />INSPECTOR <br />FILLED IN ACCORDANCE WITH SNOHOMISH HEALTH DISTRICT STANDARDS. <br />C. APPROXIMA iE LOCA TIONS OF EXISTING" IUTILITIES HA VE BEEN OBTAINED FROM A VAILAULE <br />RECORDS AND ARE SHOWN FOR CONVENIENCE THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR VERIFICA TION CIF L OCA T/ON.S' AND TO AVOID DAMAGE TO ANY ADDITIONAL : UTILI TIES <br />NOT SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE <br />CONTRACTOR .SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND .ANY CHANGES REQUIRED <br />