Laserfiche WebLink
LENGTH AS REQUIRED 100' D <br />MAY BE REDUCED TO SO' MI <br />SITES WITH LESS THAN ONE <br />OF EXPOSED SOIL OR A,PPRO <br />PLACE CONSTRUCTION GEO- <br />STABILIZATION FROM THE E <br />ROADWAY TO THE CONSTRL <br />OR AS DIRECTED BY THE EN ...w_,. <br />WE <br />I <br />m <br />m <br />I <br />MOTES <br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL <br />MEET THE REQUIREMENTS OF'WSDOTSTANDARD <br />SPECIFICATION SECTION 8-01.3(7). <br />INSTAL_ DRIVEWAY CULVERT <br />(F THERE IS A ROADSIDE MTCH <br />PRESENT <br />30' MIN TYPICAL <br />PERMEABLE BALLAST TYPICAL SEE <br />STANDARD SPECIFICATION <br />SECTION 9-03. (2) <br />PROVIDE FULL WIDTH OF <br />INGRESS/EGRESS AREA <br />15, MIN <br />COE STD DWG #201 <br />N TS <br />IT' ! , WATER,MA AG f ENTMM,A• LIQAL <br />1 "'° schIedur l 4,3'f c spr ,,firer <br />q-Y<: �r .., ... ., <br />.. "u a�^�1',pyn ry�}{",� iL. 6.. 'M. .:'N�..".°� lup ,t'�".t h�k...'�Ch9- .yp,:..'�11ct;.3,,4.1.ry�f .� W.p•w.. �`4 g.ye4� x @' ; ,i{.. <br />+ .. �k44. ll:4 .1.-4 t; f� ,', . & ti✓^+:h ..,. 'S �,w k+ ..'f. a P. W+.. ...9 .� .4 4 A 4a T - ,�"'i <br />IL � wI1 ( x r,` � F i t m . rc 1, . ;arDl al ku ��ti `4 61.E `D Iin,3 rn <br />I 4 InG`I Ica S=ffiYt Iu ? b p%kY I v, M ( ; Sti Ux �Ihw�z.` . i ,.a (Y yi4�0C <br />T,;-'II7'laY.t'E'f,Ii.#. <br />1 S f' I( O'tlt'w1 and"A &Z' Aopfxmli to <br />Figure' 3.1, <br />N TS <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, <br />RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR <br />UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND <br />THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND <br />SEDIMENT LADEN !HATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />3. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS <br />NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />S. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />S. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO <br />PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT, ADDITIONAL MEASURES MAYBE REQUIRED TO <br />ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />10, THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY <br />1 THROUGH SEPTEMBER 30. <br />m <br />A. <br />ALL ENVIRONMENTALLY SENSITIVE AREAS AND THEIR BUFFERS SHALL BE FLAGGED FOR EASY IDENTIFICATION BEFORE CLEARING TAKES PLACE. AFTER THESE <br />AREAS ARE FLAGGED AND CLEARING LIMITS ARE APPROVED, AN AREA WIDE ENOUGH TO INSTALL A SILT FENCE AT THE CLEARING LIMITS, BY HAND OR BY <br />MECHANICAL METHODS, MAY BE CLEARED. THE TOP OF THE SILT FENCE SHALL BE RE —FLAGGED AFTER INSTALLATION. IF A SILT FENCE IS NOT REQUIRED, <br />THE AREA SHALL BE DELINEATED USING AN ORANGE BARRIER. <br />B. <br />ALL PERIMETER EROSION AND SEDIMENT CONTROL SHALL BE CONSTRUCTED, OPERATIONAL, AND INSPECTED BY THE PUBLIC WORKS INSPECTOR PRIOR TO <br />INITIATION OF CLEARING AND GRUBBING OPERATIONS. <br />C. <br />DANGER TREES SHALL BE IDENTIFIED THROUGH A JOINT INSPECTION INVOLVING BOTH THE DEVELOPER AND PUBLIC WORKS INSPECTOR. NO TREES SHALL BE <br />REMOVED UNTIL PERMISSION IS OBTAINED FROM THE APPROPRIATE PARTIES <br />D. <br />WHERE POSSIBLE, NATURAL VEGETATION SHALL BE MAINTAINED FOR EROSION AND SEDIMENT CONTROL. <br />E. <br />AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED AS <br />REQUIRED TO ENSURE CONTINUING EROSION/SEDIMENT CONTROL. <br />F. <br />ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR <br />CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL, AND THE POTENTIAL FOR EROSION HAS PASSED. <br />G. <br />AT A MINIMUM, EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE MAINTAINED MONTHLY, OR FOLLOWING EACH RUNOFF PRODUCING STORM, TO ENSURE <br />PROPER OPERATION OF ALL EROSION AND SEDIMENT CONTROL FACILITIES. <br />H. <br />APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE, NOR LOCATION OF PERMANENT PIPES, RESTRICTORS, OR DETENTION <br />FACILITIES; BUT IS AN APPROVAL OF EROSION AND SEDIMENT CONTROL BMPS ONLY. <br />L. <br />THE PUBLIC RIGHT—OF—WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS FROM THE SITE WILL NOT BE ALLOWED. FAILURE TO COMPLY WITH THIS <br />CONDITION WILL RESULT IN ALL WORK ON THE SITE BEING STOPPED. <br />J. <br />THE WASHINGTON STATE CLEAN AIR ACT REQUIRES THE USE OF ALL KNOWN, AVAILABLE, AND REASONABLE MEANS OF CONTROLLING AIR POLLUTION, <br />INCLUDING DUST. DUST CAN BE CONTROLLED BY WETTING EXPOSED SOILS, WASHING TRUCK WHEELS BEFORE THEY LEAVE THE SITE, AND INSTALLING AND <br />MAINTAINING ROCK CONSTRUCTION ENTRANCES. CONSTRUCTION VEHICLE TRACK —OUT IS A MAJOR SOURCE OF DUST AND ANY EVIDENCE OF TRACK —OUT CAN <br />TRIGGER FINES FROM THE DEPARTMENT OF ECOLOGY OF THE PUGET SOUND AIR POLLUTION CONTROL AGENCY. <br />K. <br />EVERY EFFORT SHALL BE MADE TO CLOSE UTILITY LINES BY THE END OF THE DAY AND MATERIAL EXCAVATED DURING UNDERGROUND UTILITY CONSTRUCTION <br />SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES (WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS). <br />L. <br />CONSTRUCTION EQUIPMENT AND VEHICLES MUST BE MAINTAINED SO THEY DO NOT LEAK FUELS OR LUBRICANTS. DURING CONSTRUCTION, A STAGING AREA <br />MUST BE SPECIFIED FOR ALL VEHICLE MAINTENANCE ACTIVITIES. THE STAGING AREA MUST BE LOCATED WELL AWAY FROM ALL DRAINAGE COURSES. WHERE <br />POSSIBLE, ALL STORMWATER FROM RELATED MAINTENANCE AREAS MUST BE DIRECTED TO THE SANITARY SEWER, RATHER THAN THE STORMWATER SYSTEM. <br />M. <br />DURING CONSTRUCTION ACTIVITIES, ALL SPILLS OF FUEL AND HAZARDOUS MATERIALS MUST BE CONTAINED AND REMOVED IN SUCH A MANNER AS TO <br />PREVENT THEIR ENTERING THE WATERS AND SOILS OF THE STATE. CLEANUP OF SPILLS MUST TAKE PRECEDENCE OVER OTHER WORK ON SITE. <br />N. <br />DURING CONSTRUCTION, ALL PETROLEUM PRODUCTS, CHEMICALS, AND BUILDING MATERIALS THAT COULD CONTAMINATE RUNOFF MUST BE STORED IN A LINED <br />COVERED AREA. AN IMPERVIOUS BERM MUST BE CONSTRUCTED AROUND THE PERIMETER OF THE STORAGE AREA. THE STORAGE AREA MUST BE LOCATED <br />AWAY FROM ENVIRONMENTALLY SENSITIVE AREAS. <br />0. <br />IN ORDER TO EXPEDITE PLAN REVIEW, A HAZARDOUS MATERIALS INVENTORY UST SHALL BE PROVIDED AS A PART OF THE SUBMITTAL FOR BUILDING PERMITS. <br />THE STORAGE, HANDLING AND USE OF HAZARDOUS MATERIALS MUST BE IN COMPLIANCE WITH ARTICLE 80 OF THE UNIFORM FIRE CODE, 1991 EDITION. <br />DEMOLITION <br />1. <br />DEMOLITION NOTES ARE FOR CLARIFICATION ONLY AND ARE SHOWN FOR THE CONTRACTOR'S BENEFIT. THESE NOTES ARE NOT INTENDED TO BE COMPREHENSIVE. <br />THE CONTRACTOR SHALL REMOVE OR RELOCATE ALL EXISTING ON —SITE IMPROVEMENTS NECESSARY TO ACCOMMODATE THE PROPOSED CONSTRUCTION. <br />2. <br />THE DESIGN SHOWN IS BASED UPON THE ENGINEER'S UNDERSTANDING OF THE EXISTING CONDITIONS. THE PLAN DOES NOT REPRESENT A DETAILED FIELD <br />SURVEY. Tk-�E EXISTING CONDITIONS SHOWN ON THIS PLAN SHEET ARE BASED UPON THE TOP®GRAPHIC SURVEY PREPARED BY AXHSS4Rl�EY AND�M-APP1°NG; . ,- <br />DATED UPDATED ELECTRONIC VERSION OF THE TOPOGRAPHIC INFORMATION ON 04/28/2016 AND THE AUBURN MEDICAL CENTER CENTRAL UTILITY <br />PLANT PHASE I PLANS DATED 11 /02/2016. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING FIELD CONDITIONS PRIOR TO BIDDING THE PROPOSED SITEWORK <br />IMPROVEMENTS. IF CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITEWORK <br />WHICH WOULD BE AFFECTED. IF CONTRACTOR DOES NOT ACCEPT EXISTING SURVEY, INCLUDING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, <br />HE SHALL HAVE MADE, AT HIS OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT IT TO THE OWNER FOR REVIEW. <br />3. <br />CAUTION — NOTICE TO CONTRACTOR <br />THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON <br />RECORDS OF THE VARIOUS UTILITIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING <br />COMPANY AT LEAST 8 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT <br />EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY 4 Q <br />FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES AND EXISTING IMPROVEMENTS <br />WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS ON THE PLANS. <br />4. <br />CONTRACTOR IS TO REMOVE ALL EXISTING SURFACE IMPROVEMENTS AND DEBRIS WITHIN THE LIMITS OF WORK UNLESS OTHERWISE NOTED. ALL DEBRIS FOUND <br />ON SITE SHALL BE DISPOSED OF IN ACCORDANCE WITH APPLICABLE STATE CODES; <br />5. <br />CONTRACTOR TO PROTECT EXISTING FEATURES WHICH ARE TO REMAIN. <br />6. <br />ABANDONED ON —SITE PIPES LOCATED OUTSIDE PROPOSED BUILDING PAD LIMITS WITH AN EXCESS OF 3' COVER MAY BE DECOMMISSIONED AND ABANDONED IN <br />PLACE, PROVIDED THAT THESE ABANDONED UTILITIES ARE GROUTED AND CAPPED. EXISTING SUBSURFACE IMPROVEMENTS AND DEBRIS WITHIN THE PROPOSED <br />BUILDING PAD AREA, INCLUDING 10' BEYOND FOUNDATIONS, SHALL BE REMOVED. PLAN APPROVFm <br />(13 <br />7. <br />CONTRACTOR SHALL ADJUST ALL EXISTING MANHOLE RIMS, DRAINAGE STRUCTURES, VALVE BOXES, VAULT LIDS AND UTILITY ACCESS STRUCTURES TO FINISH <br />I I� ��� <br />GRADE WITHIN AREAS AFFECTED BY PROPOSED CONSTRUCTION. I , I� ; <br />8. <br />A GRIND AND OVERLAY MAY BE REQUIRED AFTER CONSTRUCTION IMPACTS ARE COMPLETED. THIS WILL BE REQUIRED BY THE CITY OF AUBURN IF THE PUBVEC <br />TRENCHING AND ROAD IMPACTS EXTEND OUTSIDE THE LIMITS SHOWN ON THE PLANS. <br />pp,qpx11 yypp�;!p^q;y <br />lSuu'+.:W3S USryl�Gn <br />t h'uaef'w'H'_,?UN$pE <br />9 <br />SUBMIT A PEDESTRIAN DETOUR PLAN TO THE CITY OF AUBURN FOR REVIEW AND APPROVAL BEFORE ANY DEMOLITION OCCURS. <br />DEPAP. <br />NAVIX PROJECT <br />r NUMBER: <br />.�,.r <br />PROJECT ADDRESS <br />'"M ". �3u <br />- w w - 11/2o,02a17 <br />REV ISSUED FOR: DATE <br />I CITY PERMIT 09.13.17 <br />ra,xa ;e, axs�s„ ,c r.,a.; .,.4w=-:.�rmr:. .�^w....w�z .ar.::�_a�r ... h.:._� . z -. �, : s��w ._s.,�st• <br />1 <br />SECTION, TOWNSHIP, ;;1 IP A •.1 <br />SE 114, SW 114 OF SECTION 14, <br />TOWNSHIPO RW H RANGE EAST, W.M. <br />S SHEET <br />E, NAME <br />---^-^---�EyBRED ilk 1i Ae a IFv%, N <br />P'+R03ECT. APPROVAL OR 1.r�.nn I <br />NUMBER <br />I4� �p c w FS Pd6�MIT Fein P ONS711 RuD TTION BIAS <br />II C,Afl If Ib::B_. •N�J�.IIiWS.CW BEEN �Qd �L�. <br />x <br />MI1 <br />