My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4328 HOYT AVE Geotech Report 2022-10-25
>
Address Records
>
HOYT AVE
>
4328
>
Geotech Report
>
4328 HOYT AVE Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:00:12 PM
Creation date
3/1/2022 1:20:01 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
4328
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation—REVISED NGA File No. 1148519 <br /> Staniford Residence Remodel June 23,2020 <br /> Everett,Washington Page 7 <br /> Erosion Control <br /> We interpret the erosion hazard for the on-site soils is to be low when exposed, but actual erosion <br /> potential will be dependent on how the site is graded and how water is allowed to concentrate. Best <br /> Management Practices (BMPs) should be used to control erosion. Areas disturbed during construction <br /> should be protected from erosion. Erosion control measures may include diverting surface water away <br /> from the stripped or disturbed areas. Silt fences and/or straw bales should be erected to prevent <br /> muddy water from leaving the site. Disturbed areas should be planted as soon as practical and the <br /> vegetation should be maintained until it is established. Erosion potential of areas not stripped of <br /> vegetation should be low. <br /> Temporary and Permanent Slopes <br /> Temporary cut slope stability is a function of many factors, including the type and consistency of soils, <br /> depth of the cut,surcharge loads adjacent to the excavation, length of time a cut remains open, and the <br /> presence of surface or groundwater. It is exceedingly difficult under these variable conditions to <br /> estimate a stable, temporary, cut slope angle. Therefore, it should be the responsibility of the <br /> contractor to maintain safe slope configurations at all times as indicated in OSHA guidelines for cut <br /> slopes. <br /> The following information is provided solely for the benefit of the owner and other design consultants <br /> and should not be construed to imply that Nelson Geotechnical Associates, Inc. assumes responsibility <br /> for job site safety. Job site safety is the sole responsibility of the project contractor. <br /> For planning purposes, we recommend that temporary cuts in the soils on site should be no steeper <br /> than 2 Horizontal to 1 Vertical (2H:1V). If significant groundwater seepage or surface water flow were <br /> encountered, we would expect that flatter inclinations would be necessary. We recommend that cut <br /> slopes be protected from erosion. The slope protection measures may include covering cut slopes with <br /> plastic sheeting and diverting surface runoff away from the top of cut slopes. We do not recommend <br /> vertical slopes for cuts deeper than four feet, if worker access is necessary. We recommend that cut <br /> slope heights and inclinations conform to appropriate OSHA/WISHA regulations. <br /> Permanent cut and fill slopes should be no steeper than 2H:1V. However, flatter inclinations may be <br /> required in areas where loose soils are encountered. Permanent slopes should be vegetated and the <br /> vegetative cover maintained until established. <br /> NELSON GEOTECHNICAL ASSOCIATES,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.