Laserfiche WebLink
rir.1.a.0 sErv. .i <br /> NELSON Project: Staniford Residence File No.: 11485B20 <br /> Underpinning <br /> GEOTECHNICAL Owner: John Staniford Date: 8/5/2020 <br /> ASSOCIATES,INC Location: Everett,WA Report No: 3 <br /> 17311 135TH Ave.NE#A-500 Weather: Sunny, 70's Page 1 of 2 <br /> Woodinville,WA 98072 Purpose of <br /> (425)486-1669 FAX 481-2510 Visit: Construction Monitoring By: KSB <br /> Wenatchee,WA 509 665-7696 <br /> We visited the site today at the request of John Staniford to provide geotechnical consultation and <br /> construction monitoring services for the Staniford Residence Underpinning located at 4328 Hoyt <br /> Avenue in Everett,Washington. <br /> Upon arrival to the site we met with John Staniford and the pile contractors from Advanced Foundation <br /> Supports to discuss the days plans. We observed the installation of pin piles per the plans. We were <br /> informed that measurements slightly differed, and as such the piles were evenly spaced and two <br /> additional piles were added. The piles to be driven consisted of 2-inch diameter, schedule 80, steel pipe, <br /> in 5'3" and 10'6" sections that were connected with internal slip couplers. The piles were driven to a <br /> refusal criteria of less than one inch of vertical movement in 60 seconds of continuous driving with a <br /> 140-pound Rhino Heavy Duty Post Driver. We monitored as each of the pin piles were driven to refusal. <br /> The depths of refusal and corresponding pile numbers are listed in the table below. The depths are <br /> measured from the existing ground surface. The locations of the pin piles can be found on the attached <br /> site plan. <br /> Pile Number Pile Embedment(feet) <br /> P4 18.5 <br /> P35 17.5 <br /> P13 15.2 <br /> P15 20.5 <br /> PS 26.2 <br /> P6 27.9 <br /> P16 15.2 <br /> P17 17.8 <br /> P7 Driven,Not Finished <br /> P18 17.9 <br /> P19 15.5 <br /> It is our opinion that the test piles were adequately installed and driven to refusal in accordance with our <br /> recommendations. We will continue to monitor the site during pile installation. <br /> Attachments: Site Plan Signed: 04���/1 <br /> Distribution: �' Katelyn Brower,GIT <br />