Laserfiche WebLink
1/20/2022 Page <br /> City of Everett <br /> 3:00:23PM <br /> INSPECTION ACTIVITY REPORT <br /> 6/2/2021 6/2/2021 BLDG KMK APPROVAL as noted (6/2/2021 3:49 PM KMK) <br /> 02-FOOTING/SETB Set backs on north and south side approved <br /> at 1'6".See attached email. <br /> 6/2/2021 6/2/2021 BLDG KMK APPROVAL as noted 6/1/2021 4:53 PM Jordan Bosa <br /> 03-FOUNDATION <br /> Contact Name:Jordan Bosa <br /> Site Address:2110 ROCKEFELLER AVE <br /> Phone:4255018126 <br /> e-Mail:jordan@bosaconcrete.com <br /> (6/2/2021 3:49 PM KMK) <br /> Set backs on north and south side approved <br /> at 1'6".See attached email. <br /> 6/29/2021 6/29/2021 BLDG DWF APPROVAL eTRAKiT Inspection 6/28/2021 8:35 AM Michael List <br /> 07-EXTERIOR Request <br /> Contact Name:Michael List <br /> Site Address:2110 ROCKEFELLER AVE <br /> Phone:4254469506 <br /> e-Mail:listmicha@gmail.com <br /> 7/6/2021 7/7/2021 BLDG 09-FIRE KMK APPROVAL Densglass north and 7/5/2021 10:20 AM Michael List <br /> STOPPING/BLOCK south side ok <br /> Contact Name:Michael List <br /> Site Address:2110 ROCKEFELLER AVE <br /> Phone:4254469506 <br /> e-Mail:list.micha@gmail.com <br /> Densglass north and south side ok. <br /> ok to side and roof <br /> 8/23/2021 8/24/2021 BLDG DWF APPROVAL Approved to cover 8/21/2021 9:56 AM Michael List <br /> 08-FRAMING <br /> Contact Name:Michael List <br /> Site Address:2110 ROCKEFELLER AVE <br /> Phone:4254469506 <br /> e-Mail:list.micha@gmail.com <br /> (8/26/2021 1:36 PM KLC) <br /> Approved to cover <br /> 9/8/2021 9/8/2021 BLDG KMK PARTIAL APPR walls only 9/7/2021 6:54 PM Michael List <br /> 12-INSULATION Would like to talk to you about the <br /> insulation&further steps.Wall insulation <br /> has been completed.I am at home and <br /> anytime works but I am in a meeting from <br /> 9-l0am <br /> Contact Name:Michael List <br /> Site Address:2110 ROCKEFELLER AVE <br /> Phone:4254469506 <br /> e-Mail:list.micha@gmail.com <br /> (9/8/2021 10:20 AM KMK) <br /> Walls only <br /> 9/22/2021 9/22/2021 BLDG KMK NO ACCESS eTRAKiT Inspection 9/21/2021 5:54 PM Michael List <br /> 10-DRYWALL Request not sure if required-drywall has been hung <br /> on 9/21 and will be firetaped on 9/23 <br /> Contact Name:Michael List <br /> Site Address:2110 ROCKEFELLER AVE <br /> Phone:4254469506 <br /> e-Mail:list.micha@gmail.com <br /> 9/23/2021 9/23/2021 BLDG KMK APPROVAL eTRAKiT Inspection 9/22/2021 6:58 PM Michael List <br /> 10-DRYWALL Request any pieces of drywall or other material <br /> against the new drywall has been removed. <br /> attic access is accessible and stairs are <br /> pulled down for access if required <br /> Contact Name:Michael List <br /> Site Address:2110 ROCKEFELLER AVE <br /> Phone:4254469506 <br /> e-Mail:list.micha@gmail.com <br /> 1NSP12 CRWSYSTEMS <br />