My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2401 TAYLOR DR 2022-08-29
>
Address Records
>
TAYLOR DR
>
2401
>
2401 TAYLOR DR 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 8:21:12 AM
Creation date
3/2/2022 8:52:13 AM
Metadata
Fields
Template:
Address Document
Street Name
TAYLOR DR
Street Number
2401
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The construction supervisor will be responsible for maintaining all BMPs during construction <br /> and working with the City to relocate or add BMPs as necessary as site conditions change. <br /> BMPs should be inspected and maintained as needed after every rain event producing more <br /> than %4" of rain in a 24-hour period. Also, BMPs shall be inspected on a weekly basis even <br /> if site work is,not:occurring. <br /> 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to control <br /> the quality of stormwater discharges. Whenever inspection and/or monitoring reveals that <br /> the BMPs identified in the Construction SWPPP are inadequate,due to the actual discharge <br /> of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design <br /> changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the.site. <br /> The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant effect <br /> on the discharge of pollutants to waters of the state. <br /> The.SWPPP shall be modified if,-during inspections or investigations conducted by the <br /> • owner/operator, or the applicable local or state regulatory authority, it is determined that the <br /> SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include additional <br /> or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall <br /> be completed within seven days following inspection. <br /> 13: Protect On-Site Stormwater Management BMPs for Runoff from Hard Surfaces <br /> No infiltration or dispersion BMPs-are proposed forthis protect. <br /> 5. SOURCE CONTROL <br /> This project proposes to replace an existing SFR and add pavement driveway surfaces. <br /> Volume IV of the 2019 DOE Stormwater Management Manual was reviewed for specific <br /> BMPszequwedforths type of#and-use..None lathe activities or land uses contained in any <br /> of the chapters in Volume IV applies to this project. Therefore,no site/development specific <br /> source control BMPs are required for this project. <br /> Haack-Taylor Drive 19-1112 <br /> January 2020. <br /> Revised 'Octobbr'2020 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.