Laserfiche WebLink
PUBLIOINORKS PERMIT 11/5/2019 <br /> City of Everett Permit ServicesPubl• DateAPPlied: <br /> orks Permit#: PW1911-005 <br /> E V E R E T T 3200 Cedar Street, 2 0 Floor Associated Bldg Permit#: <br /> Everett, WA 9821 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $1516.07 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: o "N 2020 <br /> ST MARY MAGDALEN PARISH-EVERETT NGUYEN HAI <br /> 710 NINTH AVE <br /> SEATTLE,WA,98104 <br /> PHONE: PHONE:2065797621 <br /> TAX PARCEL ID#:28051800200100 SITE ADDRESS:8517 7TH AVE SE <br /> DESCRIPTION: LANDSCAPE IMPROVEMENT ON DRY 150'X150'AREA WITHIN CHURCH <br /> PROPERTY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 12/23/2019.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upcmconon of <br /> the project prior to final approval of the permit. ,__.. ,• _..,--x, '_ 4'"' <br /> 7. Keep City streets clean at all times. No dirt, mud,rocks,or debris to be tracked onto roadway—,—icy,-, x:rn <br /> 8. Protect all existingunderground utilities duringconstruction. = <br /> g 1 :7 r.-, a r,crD <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replacEre€'imperAuTstir•°f Pes vrifi be managed <br /> on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easeOpnts.;i,�.the <br /> improvements located therein. p `i' m <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. I e'quest a final inspection on by <br /> selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests for this permit vw en all items have been comted. <br /> Public Works Permit Fee Breakdown: �+1* a <br /> [_T'4 g r•.:l rS:t•r:•.roe rYJ <br /> Erosion Control $200.00 + r�A <br /> Paving(4,950SF) $45.00 I <br /> i <br /> PW Plan Review $20.00 ` N 1 <br /> PW Site Inspection $20.00 eiry ® "� <br /> Stormwater System Development Fee $1,231.07 P ®F <br /> erg/t se yTT. <br /> s <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> /2-12-3 20 I causes of action that may arise because of installation and maintenance of <br /> A proved for Construction(Public Works) Date the improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace public <br /> property damaged thereby. <br /> FINAL INSPECTION Date "I //O/2(5)20 <br /> Approved as Constructed(PW Inspector) Signature of Appli Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> ��L( Ca0C7Z <br />