My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
812 35TH ST 2022-03-07
>
Address Records
>
35TH ST
>
812
>
812 35TH ST 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 1:43:50 PM
Creation date
3/2/2022 11:13:34 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH ST
Street Number
812
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Rucker Hill Short Plat <br /> Minimum Requirement # 2: SWPPP Narrative <br /> Element#1: Mark Clearing Limits <br /> Clearing limits have been shown on the SWPPP Plan. <br /> Element#2: Establish Construction Entrance <br />• A temporary construction entrance has been shown near the northwest property corner on <br /> the SWPPP plan. All vehicles shall be free of debris prior to leaving the site. <br /> Element#3: Control Flow Rates <br /> Flow rates during construction are to be contained through the installation of temporary <br /> interceptor trenches along with a temporary sediment trap on the northern end of the site. <br />• <br /> Element#4: Install Sediment Controls <br /> Sediment controls mainly consist of the installation of a temporary sediment trap within the <br /> north end of the site along with silt fencing along the downslope edges of the site. <br /> I <br /> Element# 5: Stabilize Soils <br /> All soils disturbed during site grading will be stabilized by use of the most appropriate <br /> BMP method available. These consist of short-term and long-term solutions. Short-term <br /> methods consist of compaction of the soils by vibratory roller or bulldozer. Long-term <br /> methods consist of straw covering over the soils (this is in the case of the project becoming <br /> dormant for greater than 1 month). At this time no wintertime grading or construction <br /> activities will occur. During construction periods longer than 1 working week (7 days) <br /> where the soils are exposed and un-worked will use the proscribed methods in the Storm <br /> Water Management Manual for Western Washington to reduce sedimentation transported <br />• offsite. If winter grading is conducted, all exposed soils shall be covered within 2 days. <br /> Element# 6: Protect Slopes <br /> Steep slopes will be outside the clearing limits when not being graded. When graded, <br /> slopes will be protected with appropriate slope protection BMPs, such as mulching or nets <br />• and blankets, depending on site conditions during construction. <br /> Element#7: Protect Drain Inlets <br /> Catch basin inlets downstream of the site along 35th Street will be protected with catch <br />• basin sediment inserts or equivalent. <br /> Element# 8: Stabilize Channels and Outlets <br /> Channels and drainage outlets are not needed around the proposed development area on <br /> site. No stabilization is necessary. Existing channels or drainage outlets located within 500- <br /> i feet of the property of the property should be routinely inspected for debris that may dam <br /> and/or aid erosion. <br />• WESTERN ENGINEERS,INC. 10 PROJECT:16-1584-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.