Laserfiche WebLink
• <br /> Rucker Hill Short Plat <br /> No.5—Catch Basins <br />• Maintenance Defect Conditions When Maintenance is Needed Results Expected When <br /> Component Maintenance is performed <br /> Ladder Ladder dtut gs Ladder is t tnsatfe duct to missing rungs, I,adder meets design <br /> (I1rsate eraekcrithrokon rungs,rungs not securely attached standards and al lows <br /> to basin wail.axis tl igim e nt,rust,cracks,or sharp maintenance person safe <br /> edges. :access, <br />• Metal Grates Trash and Trash and debris that is blocking more than 20% (irate five of trash and <br /> (if Applicable) Debris of gate surface Wetting capacity. debris. <br /> Damaged or Grate missing or broken nremtber(s)of the grate, Grate is in place and meets <br /> Missing. design standards <br /> BMP T5.13 Post-Construction Soil Quality and Depth <br /> Maintenance <br /> • Soil quality and depth should be established toward the end of construction and once <br /> established, should be protected from compaction, such as from large machinery use, and <br /> from erosion. <br />• <br /> • Soil should be planted and mulched after installation. <br /> • Plant debris or its equivalent should be left on the soil surface to replenish organic matter. <br />• <br />• <br />• <br />• <br />• <br />• WESTERN ENGINEERS,INC. 29 PROJECT:16-1584-A <br />