Laserfiche WebLink
Developing a Soil Management Plan — SECTION FIVE <br /> Model SOIL MANAGEMENT PLAN for BMP T5.13 <br /> (available as MS Word file at www.SoilsforSalnson.org <br />' PROJECT INFORMATION Page#_of pages <br /> Complete all information on page 1;only site address and permit number on additional pages. <br /> Site Address/Lot No.: SO Z -S-/1l_ trl-` ) WA 9Q2o <br /> Permit Type: 51,e.-1- p1„4- Permit Number: <br /> Permit Holder: k M It Pe Phone: q-2S 3;0-pza-rd <br /> Mailing Address: P6 j3oy. C/ 1/./A 992-72 <br /> Contact Person: Phone: <br /> Plan Prepared By: 7 w.44 Sc�/t(�. L ( 1.4 e s <br /> ATTACHMENTS REQUIRED(Check off required items that are attached to this plan) <br /> _Site Plan showing,to scale: Areas of undisturbed native vegetation(no amendment required) <br /> New planting beds and turf areas(amendment required) <br /> Type of soil improvement proposed for each area <br /> Soil test results(required if proposing custom amendment rates) <br /> Product test results for proposed amendments <br /> AREA# (should match Area#on Site Plan) <br /> PLANTING TYPE X Turf _Undisturbed native vegetation <br /> Planting Beds _Other: <br /> SQUARE FOOTAGE OF THIS AREA: square feet <br /> SCARIFICATION _inches(depth)of scarification needed to achieve finished total 12"loosened depth. <br /> Subsoil will be scarified <br /> PRE-APPROVED 1 s7Sinches of compost or imported topsoil applied <br />✓ AMENDMENT METHOD: X 3_1 (conversion factor, inches to cubic yards) PRODUCT: 3 ets`f <br /> Topsoil import S.1F3=cu.yards per 1,000 sq.ft. <br /> X Amend with compost X q,4,000s sq.ft.in this area <br /> Stockpile and amend +72.=cubic yards of amendment —>-->-4--->--> QUANTITY: 4IL CU.YDS. <br /> ( cu.yds.stockpiled) (needed to cover this area to designated depth) <br /> CUSTOM AMENDMENT Attach test results and calculations. <br /> _Topsoil import inches organic matter or topsoil import PRODUCT: <br /> Topsoil&compost lift X 3_1 <br /> Amend =cu.yards/1,000 sq.ft. <br /> Stockpile and amend X _,000s sq.ft.in this area <br /> ( cu.yds.stockpiled) =cubic yards of amendment -*—>—>—>—> QUANTITY: CU.YDS. <br /> MULCH ,000 sq.ft. PRODUCT: <br /> X 6.2 (conversion, to give 2 inch mulch depth) <br /> =cubic yards of mulch ——>—>—>—>—> QUANTITY: CU.YDS. <br /> TOTAL AMENDMENT/TOPSOIL/MULCH FOR ALL AREAS(complete on page 1 only,totaling all areas/pages in this Plan) <br /> U Product#1: ❑Quantity: cu.yds. <br /> ❑ Test Results: %organic matter C:N ratio<25:1(except mulch,or<35:1 for native plants) "stable"(yes/no) <br /> ❑ Product#2: ❑Quantity: cu.yds. <br />✓ ❑ Test Results: %organic matter C:N ratio<25:1(except mulch,or<35:1 for native plants) "stable"(yes/no) <br /> U Product#3: ❑Quantity: cu.yds. <br /> ❑ Test Results: %organic matter C:N ratio<25:1(except mulch,or<35:1 for native plants) "stable"(yes/no) <br /> Date: Inspector: Approved: Revisions Required: <br /> Date: Inspector: Approved: Revisions Required: <br />• <br /> COMMENTS: <br />• 13 <br />