My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
812 35TH ST 2022-03-07
>
Address Records
>
35TH ST
>
812
>
812 35TH ST 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 1:43:50 PM
Creation date
3/2/2022 11:13:34 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH ST
Street Number
812
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Verifying Soil Quality and Depth — SECTION SIX <br /> matter are likely to be visible.Clay soil that been saturated <br />,• and then dried may require jumping on the shovel step to STEP 5: Check mulch depth. <br /> penetrate,but the soil should yield easily when moist.Soil <br /> that requires vigorous chipping with the shovel to Use a shovel to scrape away and reveal surface mulch <br /> penetrate probably does not meet the specification. thickness.A two inch layer of organic material(mulch) <br /> such as composted sawdust,wood chips,or ground bark <br /> Four Inch Depth of Scarified Subsoil.The next four-inch should be distinguished from the underlying soil on all <br /> depth of soil should be loose enough to penetrate with the planting beds. <br />,5 shovel.It maybe rocky,and the loosened depth may vary <br /> due to the pattern of scarifying equipment—but some <br /> sections of subsoil in a one foot square hole should be <br /> loose four inches deep into the subsoil(that is,to a total 12 FINAL STEP: Record results on "Field <br /> inch depth from the soil surface). Verification Form" or similar document <br /> (see sample form on next page). <br />.41 <br /> STEP 4: Check soil depth in several spots. <br /> Use a simple"rod penetrometer"(illustration below)to What should be attached to the Soil <br /> confirm that the soil is uncompacted twelve inches deep at Management Plan? <br />'� ten locations per acre—with a minimum of ten on smaller • Scale drawings showing layout of turf and planting <br /> sites.To locate test spots,imagine a line dividing the site beds,and identifying where soil treatments described <br /> (or each acre)in half lengthwise,then divide each half into in the SMP will be applied. <br /> five nearly equal sections.Conduct tests near the middle of <br /> each section. Additional test locations are encouraged. • Copies of compost and topsoil test results <br /> demonstrating that products contain adequate organic <br /> 10 The rod penetrometer should enter the soil twelve inches matter,and meet carbon to nitrogen ratio and stability <br /> deep,driven solely by the inspector's weight.Irregular standards. <br /> scarification or rocks in the lower layer may require • Where custom calculated amendment rates are used, <br /> probing a few spots at each location to reach the full depth. include laboratory analyses of the soil and organic <br /> matter sources plus calculations by a qualified <br /> professional showing that the organic matter <br />. requirement will be achieved. <br /> MULCH <br /> - What If A Site Does Not Meet the <br /> Soil Management Plan Requirements? <br /> LOOSE SOIL ' ` ' <br /> If inspection indicates that ane installation does not <br /> with visible dark fulfill the approved SMP,the permit holder or their <br /> organic matter : �. agent should be notified of what steps are needed to <br /> comply.Whesunisput , <br /> LOOSE OR <br /> ( poi, Y independent consultaenrltsntare shoulduclear conduct <br /> ord samplingedan for <br /> r' ' V analytical testing of organic matter as described in the <br /> FRACTURED <br /> project specifications. <br /> SUBSOIL <br /> Qualified consultants include:Certified Soil Scientists, <br /> — - J <br /> Crop Advisors or Agronomists;or Licensed Landscape <br /> Architects,Civil Engineers or Geologists. <br /> A rod penetrometer is a 4 foot long,3/8 inch or 10 mm <br /> diameter stainless steel rod with a 90 degree bend 5 inches <br /> form the top to make a handle,and a 30 degree bevel cut 1/8 <br /> inch or 3 mm into the side of the tip. <br />• <br /> fh 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.