Laserfiche WebLink
PUBLIONORKS PERMIT dik Date Applied: 5/14/2018 <br /> City of Everett Permit Services Publi�'0'Jorks Permit#: PW1805-063 <br /> E V E R E T T 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett, WA 98201 Planning Reference#: SS19-001 <br /> WASHINGTON 425-257-8810 Public Works Fee: $5,344.12 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: 0 4 JUN 2019 <br /> RUCKER HILL DEVELOPMENT LLC RUCKER HILL DEVELOPMENT LLC <br /> 13413 106TH DR SE 13413 106TH DR SE <br /> SNOHOMISH,WA,98296 SNOHOMISH,WA,98296 <br /> PHONE:4253300270 PHONE:4253300270 <br /> TAX PARCEL ID#:00548500000400 SITE ADDRESS:812 35TH ST <br /> DESCRIPTION:SITE IMPROVEMENTS TO CREATE A 3-LOT SHORT SUBDIVISION <br /> Site work to include drainage mitigation,sewer and water utilities stubbed to each lot,frontage improvements, &driveways. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br /> Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated 5/22/2019. <br /> Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at https://pw.everettwa.gov to formally request all <br /> required inspections.Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be under a <br /> separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be scheduled 3-4 <br /> weeks in advance. <br /> 7.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and Construction <br /> Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 8.A Drainage Easement is required for this project.The easement documentation must be recorded by the project team with a copy of the recorded <br /> document submitted to the City prior to final approval/close out of the permit. <br /> 9.A performance guarantee in the amount of 120%of the construction costs for all public improvements is required and shall be submitted prior to <br /> permit issuance.Release of the performance guarantee is upon inspection of the completed improvements and trade in for the below mentioned 1- <br /> year warranty. <br /> 10. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to final <br /> approval/close out of the permit. <br /> 11.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City prior to <br /> final approval/close out of the permit. <br /> 12.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.Schedule the existing Planning <br /> Landscape inspection under"My Active Inspections"in your dashboard on the Online Permitting Portal. <br /> 13.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a final inspection online by selecting PW <br /> 22-Site Final within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> Public Works Permit Fee Breakdown: <br /> Paving(5,133SF) $45.00 p.„. <br /> P,�t. <br /> ,0„ <br /> Erosion Control $80.00 (� ~,.�t 'a�:^�.�'`'.�. J } <br /> Grade/Fill/Excavate(4100CY) $290.00 i e <br /> PW Plan Review $1,217.43 j ') g 4 2 <br /> PW Site Inspection $2,434.86 <br /> Stormwater System Development Fee(5,133sf) $1,276.83 C Fry <br /> c r <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF NDIJ,l J k.ET <br /> tat r <br /> The undersigned owner/applicant hereby agrees to hord a erfSgve harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> ja/tdik 5 p?4 20i? causes of action that may arise because of installation and maintenance of <br /> the improvement or other right-of-way use here to applied for and further <br /> Approved for Construction(Public Works) Date agrees to remove same upon notice from the City and to replace public <br /> property damaged thereby. 9; L / �/// <br /> FINAL INSPECTION Date "tYp''�G "Ite'f� GLU` (II"q/� <br /> Approved as Constructed(PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180—DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> F7Le <br />