My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
812 35TH ST 2022-03-07
>
Address Records
>
35TH ST
>
812
>
812 35TH ST 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 1:43:50 PM
Creation date
3/2/2022 11:13:34 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH ST
Street Number
812
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 Ilk <br /> 9740 Evergreen Way * Everett, Washington 98204 <br /> i WESTERN <br /> ENGINEERS E� (425) 356-2700 FAX (425) 356-2708 <br /> S% SURVEYORS <br /> 1ii►• <br /> SURVEYORS•ENGINEERS•LAND USE CONSULTANTS <br /> September 5,2018 <br /> City of Everett Engineering/Permit Services <br /> Attn: Sabrina Fandler <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> 425-257-7813 <br /> RE: Plan Review Comments for Public Works Permit Application,Rucker Hill 9-Lot SP <br /> Dear Ms.Fandler <br /> Below you will find responses to comments made in your letter dated July 25,2018. <br /> 1. Resubmittal Requirements: <br /> a. Resubmit the following: <br /> i. Acknowledged. <br /> ii. Acknowledged. <br /> iii. Acknowledged. <br /> iv. Typically,the easements are recorded as part of the final plat.Uncertain as to the <br /> purpose of the easement recording document at this time. <br /> v. Acknowledged. <br /> b. Drawing Redlines: <br /> i. Corrected. <br /> ii. Corrected. <br /> iii. Corrected. <br /> iv. Corrected. <br /> y K 5 <br /> v. Corrected. <br /> 1N r --, <br /> vi. Corrected. I r <br /> vii. Corrected. L sd 1 , c '" fj rfi , I/ <br /> c. We have reviewed the PSP approval document,a am and cari not fii d aOtling specific that <br /> needs to be addressed other than what's already:noted as redline co ents. If we are <br /> missing something here,please be specific so vc e d tress.acco d gily. <br /> d. Awaiting an approval of the construction plans by the City prior'to h- 5lying for permit(s) <br /> from DOE. This cuts down on the amount of revisions sent to DOE along with helps <br /> eliminate the need for paying for a peiinit when the city hasn't granted construction plan <br /> approval. Once a verbal approval is given by the city for construction,please let us know <br /> and we will move forward with submitting for the DOE Stormwater permit. <br /> 2. Landscaping Plan. <br /> a. Landscaping revisions: <br /> i. Plant list added to plan. <br /> ii. Plant specs added to plan. <br /> iii. Staking detail added to plan. <br /> LAND USE CONSULTANTS*CIVIL ENGINEERS*LAND SURVEYO *ENGINEERING CORPORATION <br /> RAIDSERVER\2016\161584A Rucker Hill\Engineering\1'Const.Comment Response Letterqc7.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.