Laserfiche WebLink
OLT PUBLIC WORKS <br /> MEMORANDUM <br /> TO: Niels Tygesen, Planning Department <br /> FROM: Sabrina Fandler, Engineering/Public Services Department <br /> DATE: 1/28/2019 <br /> SUBJECT: Public Works Comments for SS19-001 &REVII19-002 <br /> PROPOSAL: Rucker Hill 3-Lot Short Plat Subdivision <br /> LOCATION: 812 35th St <br /> APPLICANT: Rucker Hill Development, LLC <br /> A review of this project by the Engineering/Public Works Division indicates that the following <br /> conditions shall be met: <br /> 1. Construction permits,inspections, and final approvals are required for this project from City of <br /> Everett Permit Services. <br /> 2. A Public Works Permit is required for this project for all,required short plat improvements <br /> including on-site and in the public right-of-way. Detailed drawings in accordance with City <br /> Design and Construction Standards shall be submitted to the Public Works Department, showing <br /> access, driveway, and turnaround locations, landscaping, utilities, storm drainage, temporary <br /> construction erosion and sedimentation control, grading, paving, and all required improvements <br /> in the public right-of-way. Public Works Department approval of these drawings is required prior <br /> to any permits being issued. All improvements shall be completed, approved and warranted <br /> before the permit is finaled and the proposed short plat can be recorded. <br /> 3. This project is subject to Transportation Mitigation in accordance with Ordinance 3389-14 <br /> (codified as EMC 18.40) and subsequent revision. Applicant is encouraged to obtain a copy of <br /> the Ordinance and determine applicable mitigation fees and/or other requirements prior to permit <br /> application. The actual charges shall be computed by the Public Works Department per the <br /> ordinance in effect at the time and according to the information on the approved plans at the time <br /> of building permit issuance for each building. <br /> 4. Special charges for connection to the sewer and water systems in accordance with Ordinance <br /> 3095-08 (codified as EMC 14.08.135) and subsequent revision are applicable. These charges are <br /> based on projected water usage and can be substantial. Applicant is encouraged to obtain a copy <br /> of the Ordinance and determine estimated charges prior to building permit application. The actual <br /> charges shall be computed by the Public Works Department per the ordinance in effect at the time <br /> and according to the information on the approved plans at the time of building permit issuance <br /> for each building. <br /> 5. Prior to recording the final short plat map, construction must be completed for the required public <br /> improvements/frontage improvements per Title 18 of the EMC, all required utilities to each lot, <br /> Page 1 of 4 <br />