My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
421 51ST ST SW 2022-03-02
>
Address Records
>
51ST ST SW
>
421
>
421 51ST ST SW 2022-03-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 11:26:54 AM
Creation date
3/2/2022 11:26:27 AM
Metadata
Fields
Template:
Address Document
Street Name
51ST ST SW
Street Number
421
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI ORKS PERMIT pateApplied: 2/21/2020 <br /> City o verett Permit Services <br /> PublicV'irks Permit#: PW2002-035 <br /> EVERETT 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: B1911-004 <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $177.12 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MILLER JONATHAN W&KATHY L EUSTER ZOE <br /> 421 51ST ST SW <br /> EVERETT,WA,98203 , <br /> PHONE: PHONE:4257431555 <br /> TAX PARCEL ID#:29043600403700 SITE ADDRESS:421 51ST ST SW <br /> DESCRIPTION:PAVED DRIVEWAY RECYCLED ASPHALT 360SF ON-SITE PLUS CONNECTION TO STREET. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 2/20/2020.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector. Remove <br /> upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed <br /> on-site in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 10.This permit must be finaled in order to close out this permit. Request a final inspection online by selecting PW 24-Site Final within <br /> the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: C� <br /> Paving(360SF on-site) $45.00 &5[Itjf2- <br /> PW Plan Review $20.00 MAR 2 5 2020 <br /> PW Site Inspection $20.00 <br /> Stormwater System Development Fee(360SF) $92.12 CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> < tkihnIX. -Zift6111/L <br /> 470/76 <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> � causes of action that may arise because of installation and maintenance of <br /> the improvement or other right-of-way use here to applied for and further <br /> Approved for Construction (Public Works) Dat agrees to remove same upon notice from the City and to replace public <br /> property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed(PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> Fite <br />
The URL can be used to link to this page
Your browser does not support the video tag.