Laserfiche WebLink
2/10/2022 Page 1 <br /> City of Everett <br /> 8:52:12AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. PW1709-033 Site Address 2201 100TH ST SW <br /> Applied 9/19/2017 Applicant FISHER CONSTRUCTION GROUP LLC Lot <br /> Approved 12/11/2017 Owner AUREUS LLC Block <br /> Issued 12/12/2017 Contractor Tract <br /> Parent Permit No. Description SITE WORK FOR ADDITION TO EX BUILDING <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 4/17/2018 4/17/2018 PW WATER MAIN JHK APPROVAL 600'of 8"DI.Hydro <br /> INSTALL test at 250 lbs. <br /> 6/22/2018 6/22/2018 PW EASEMENTS SEF APPROVAL Water easement <br /> RECORDED <br /> 6/27/2019 6/27/2019 PW ASPHALT JHK APPROVAL <br /> PAVING FINAL <br /> 6/27/2019 6/27/2019 PW ASPHALT JHK APPROVAL <br /> SUBGRADE <br /> 6/27/2019 6/27/2019 PW TESC JHK APPROVAL <br /> EVALUATION <br /> 6/27/2019 6/27/2019 PW ONSITE JHK APPROVAL <br /> PRECON <br /> 10/14/2020 10/14/2020 PLANNING KIH APPROVAL ok to final <br /> LANDSCAPING <br /> 11/5/2020 11/5/2020 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> 12/14/2020 12/14/2020 PW 24-SITE FINAL JHK CORRECTION (12/14/2020 11:10 AM JHK) <br /> Need as-builts. <br /> 6/4/2021 6/4/2021 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> 2/10/2022 2/10/2022 PW ASBUILTS JHK APPROVAL <br /> SUBMITTED <br /> 2/10/2022 2/10/2022 PW 1YR PUBLIC SEG NOT REQUIRE (2/10/2022 8:40 AM SEF) <br /> IMP WARRANTY Warranty period has completed,so no need <br /> for a bond to be turned in. <br /> 2/10/2022 2/10/2022 PW 25-SITE JHK APPRVD-PERI'v <br /> FINAL/PERMIT <br /> INSP12 CifilifsYs -CMS <br />