My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 100TH ST SW AD SYSTEMS 2022-03-07
>
Address Records
>
100TH ST SW
>
2201
>
AD SYSTEMS
>
2201 100TH ST SW AD SYSTEMS 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 2:19:18 PM
Creation date
3/2/2022 2:15:51 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
2201
Tenant Name
AD SYSTEMS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICO/ORKS PERMIT ODateApplied: 9/19/2017 <br /> tx City of Everett Public Works Department Public Works Permit#: PW1709-033 <br /> 3200 Cedar Street Parent Permit#: B1709-037 <br /> Everett,WA 98201 Planning Reference#: PREAPP17-023 <br /> (425) 257-8810 Public Works Fee: $2,945.50 <br /> 12 DEC 2017 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> AUREUS LLC FISHER CONSTRUCTION GROUP LLC <br /> 5014 RUCKER AVE 625 FISHER LANE <br /> EVERETT,WA, 98203 BURLINGTON, WA, 98233 <br /> PHONE: PHONE: 3607574094 <br /> TAX PARCEL ID#: 28041400300500 SITE ADDRESS: 2201 100TH ST SW <br /> DESCRIPTION: SITE WORK FOR ADDITION TO EX BUILDING <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br /> Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated 12/7/2017.Approved <br /> plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 prior to starting construction to set up an on-site pre- <br /> construction consultation.All inspections must be formally requested. See the attached handout for phone number and online instructions to <br /> Request an Inspection. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPP/Plan. Remove upon completion of the project <br /> prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. ':71 ""(i <br /> 8. Protect all existing underground utilities during construction. <br /> 9. City of Everett Water Department crews shall make all connections to City water main at owner/contrAts. x{ nsp,Thi,�work"to b0 under <br /> separate Utility Permits to be purchased at the Permit Services Counter per a cost estimate by the Wat. Dep.' rtiTie—;V 7 -shalfie scheduled 3- <br /> 4 weeks in advance. <br /> j� ,.-_�,,._S A ri <br /> �, _ ?i Y i Pi F i=• <br /> 10.As-builts of storm,sanitary sewer, and water systems will be required to be submitted to the PW Inspector per`Z ys toen arr .'Construction <br /> Standards and Specifications for Development prior to final approval/close out of the permit. Corrected water line information mualoe s 4 rnitted <br /> r_.a r� r•.7 <br /> with as-builts for this project. ,gyp �:17 <br /> 11. On-site water main will be staked within an easement to the City. The easement documentation must Nsubmitted to the City for approval <br /> prior to recording,then must be recorded by the project team with a copy of the recorded document submitted to the City prior to final 1:':i <br /> approval/close out of the permit. <br /> 12. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvementsEg t Ize.submitted to the City prior t i final <br /> approval/close out of the permit. Public improvements include the water main. 1-4 <br /> :•s ,. e r rt <br /> 13.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Ind? 9toi pprffiG€ -Planning Department <br /> at 425-257-2273 to schedule the inspection. ° 1—' <br /> 14.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy for the' dit'iorr. tell tfie inspection link g request <br /> a Final for this permit when all items have been completed. P.; <br /> Public Works Permit Fee Breakdown: <br /> Paving(24,000SF) $120.00 <br /> Erosion Control $200.00 <br /> Grade/Fill/Excavate(1,100CY) $245.00 <br /> PW Plan Review $793.50 <br /> PW Site Inspection $1,587.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date a��� <br /> Approved as Constructed (PW Inspector) Sign.- F' plicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> lEVfi <br />
The URL can be used to link to this page
Your browser does not support the video tag.