My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 100TH ST SW AD SYSTEMS 2022-03-07
>
Address Records
>
100TH ST SW
>
2201
>
AD SYSTEMS
>
2201 100TH ST SW AD SYSTEMS 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 2:19:18 PM
Creation date
3/2/2022 2:15:51 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
2201
Tenant Name
AD SYSTEMS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVT <br /> October 24, 2017 <br /> Seth Burwash <br /> Fisher Construction Group <br /> Re: Everett Public Works Plan Check No: B1709-037 <br /> AD Systems Warehouse Expansion at 2201 100th St. SW <br /> Response to Plancheck Correction Notice <br /> Dear Seth: <br /> We have received the plancheck comments referenced above dated October 16th. Here is our response. <br /> Suggested Corrections PSM Response <br /> "4. It appears the chevron ("v") braced Please see calculations. HSS 5x5x3/8 and connections are adequate <br /> frames are being provided between the with overstrength factor. <br /> column bays. However, it is unclear from <br /> the permit calculations that horizontal <br /> beams (HSS 5x5x3/8) has been designed <br /> with the brace forces in tension and <br /> compression modeled per AISC 341-10 Sec <br /> 4a (1) requirements. Please clam and <br /> revise connection and details relevant to the <br /> HSS beam." <br /> "5. Please address the lateral bracing of Please see calculations. HSS 5x5x3/8 brace stiffness and combined <br /> the new horizontal HSS 5x5x3/8 beams that forces from nodal bracing load adequate. <br /> form the intersection of the new braces per <br /> AISC 341-10 Sec 4b." <br /> "6. It appears the existing columns are Please see calculations. Existing W10x33 are adequate with <br /> being used as part of the revised lateral overstrength factor. <br /> force resisting system configuration. Please <br /> address the strength requirements of the <br /> existing columns per AISC 341-10 Sec D4 <br /> (1)and(2)." <br /> "7. It appears that details 1/S2.3, 2/S2.3, Please see calculations. 1/S2.4 horizontal weld updated, 1/S2.3 and <br /> and 1/S2.4 are receiving additional welds 2/S2.3 vertical welds updated. <br /> and plate connections to existing gusset <br /> plates and columns. The permit <br /> calculations show the design of brace to <br /> gusset plate. Please provide additional <br /> calculations that verb that force transfer of <br /> the new braced frame can resist the new <br /> geometry and forces provided as result of <br /> the new OCBF. Please indicate connections <br /> checks such as the gusset plate interface to <br /> the existing beams and columns, Whitmore <br /> section checks and etc. <br /> 2200 6TH AVENUE, #601 WWW.PSM-ENGINEERS.COM PHONE 206-622-4580 <br /> SEATTLE WASHINGTON 98121 USA _ FAX 206-622-0422 <br />
The URL can be used to link to this page
Your browser does not support the video tag.