Laserfiche WebLink
INSPECTION REPORT <br /> Date S/i41;i Permit: al -707-Q3—7 <br /> loPP— <br /> Contractor: FiSh e�' &h9t-' <br /> AKOwner: 4/!-G _ <br /> ereceSite Address: 1_ I 00±-i't S-- SW <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains uilding Final ❑Gas Pipe Final HWT Final <br /> OTHER OR ATION: fi'c #i 9(.30, _o)99.-- 36? <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required ' <br /> -56-PfRoor-o' p AI 61--E—D ........, <br /> A -D _ f, VI L6-7X7z. riled M <br /> pr-Inspector: Date: i 5-` <br /> EIR(10/06) DATABAR,INC. <br />