Laserfiche WebLink
PUBLIC WORK • <br /> Item Unit Quantity Unit Price Amount <br /> Construction Storm Drainage <br /> Temporary Silt Fence L.F. 5.00 <br /> Grading for drainage swales L.F. 2.00 <br /> Other <br /> Other <br /> Construction Storm Drainage Total $ <br /> Clearing &Grading <br /> 12"wide area L.F. 2.50 <br /> Right-of-Way L.F. 12.00 <br /> Total grading/cut/fill C.Y. See EMC <br /> (total earth moved) 13.80.010 <br /> Clearing and Grading Total: $ <br /> //C) <br /> COST EST FEE CALC-2017 <br />