My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 100TH ST SW AD SYSTEMS 2022-03-07
>
Address Records
>
100TH ST SW
>
2201
>
AD SYSTEMS
>
2201 100TH ST SW AD SYSTEMS 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 2:19:18 PM
Creation date
3/2/2022 2:15:51 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
2201
Tenant Name
AD SYSTEMS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-1- <br /> • PUBLIC WORKS DEPARTMENT • "` 0 ' `9 <br /> re <br /> Utilities Division,3200 Cedar.Street <br /> , WEverett WA 98201 <br /> 425-257-8800 <br /> COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> X Cost of Work Order $1689.00 Work.Order# <br /> Cost of Service Order - Service.Order# <br /> Contact Person Seth.Burwash Telephone# . 360 757-5676 <br /> Requested By Sabrina Fandler Date of Request 12-13-2017 <br /> Property Owner(name) Au reus LLC . <br /> Charge Cost to(name if different than owner) Seth Burwash!Fisher Construction Group LLC <br /> Address 62.5 Fisher Lane City Burlington, WA Zip 98223 <br /> Installation Location 2201 100th St SW <br /> Installation type/description/size/etc. Connect contractor installed 8" Di. pipe to existing 8" D.I. <br /> water main. Estimate is for the East connection, contractor to excavate,shore and restore. <br /> Please note;must have purity proir to connection. <br /> Service size: 8" Type: Water Main connection <br /> The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities.Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before worlc.can be performed. <br /> WATER METERS.3 AND LARGER MAY HAVE A SIX TO 1.0 WEEK LEAD TIME. <br /> Material cc: Bldg.Permit Center <br /> $596.00 Mark Sadler <br /> Labor and Benefits $962.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $60.00 Paul McKee <br /> Tax $81.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration <br /> Sabrina Fandler <br /> TOTAL $1689.00 Benyani Stephanos <br /> Prepared by: 40 Jim Spooner Date Estimate Prepared 12/15/2017 <br /> Accepted by: . -". /4 Representing It°5 4. 4C C 0,40,. <br /> At1 cc. d <br /> ESTIMATE GOOI)FOR 6 MON i IIS <br /> 4ir <br /> S:\#Common\clerical\Cost.est\2015.\2201 100th St SW east CEFP <br /> 1 ofi <br />
The URL can be used to link to this page
Your browser does not support the video tag.