Laserfiche WebLink
• <br /> 1 <br /> Work Activity Work Order Page f <br /> 4/19 . 8 <br /> Issued By SJT2 SPOONER,JAMES T. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 4/19/2018 <br /> Fund 401 Account 6 Program 710 Function 119 Activity 673 <br /> Program <br /> Title TAP 8 INCH 2201 100TH ST SW 710119673 <br /> Work Order No 20181075 Project Activity Type CORRECTIVE MAINTENANCE Status PR <br /> Status 4/19/2018 Time 07:09 Original WO Billing <br /> Recommended Action <br /> Approved By Job Cost Information(Y/N) <br /> Start Date / I Time • Date Completed /f I 19jf t Permit No <br /> Completed By f S Time Follow Up? <br /> Problem Details <br /> CONNECT EXISTING 8"DJ. MAIN TO CONTRACTOR INSTALLED 8" <br /> D.I. MAIN AFTER PURITY. THIS WORK ORDER IS FOR THE EAST <br /> CONNECTION. <br /> Structure ID StrTvp Activity Compl Date Comments <br /> WML1484X01 WAMA1N <br /> i <br /> Address 2201 100TH ST SW <br /> Cross Street <br /> Area Designator • Structure Location <br /> Map Reference <br /> Location • <br /> • <br /> • <br /> 3 <br />