Laserfiche WebLink
1 <br /> If <br /> 1 <br /> I pJ <br /> 1 <br /> i <br /> i <br /> Work Activity Work Order page II 1 <br /> 4/19/2018 7:32 i <br /> Issued By SJT2 SPOONER,JAMES T. I <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 4/19/2018 1 <br /> Fund 401 Account s Program 710 Function 119 Activity 673 <br /> Program <br /> Title TAP 8 INCH 2201 100TH ST SW WEST SIDE 710119673 <br /> Work Order No 20181076 Project Activity Type CORRECTIVE MAINTENANCE Status PR s <br /> Status 4/19/2018 Time 07:29 Original WO Billing r <br /> i <br /> Recommended Action <br /> Approved By Job Cost Information(Y/N) i <br /> Start Date / / Time _ Date Completed , .. /i' 1 I Permit No i <br /> Completed By_ Time Follow Up? <br /> Problem Details I <br /> I <br /> CONNECT EXISTING 8"D.I.MAIN TO CONTRACTOR INSTALLED 8" <br /> Di.MAIN AFTER PURITY. THIS WORK ORDER IS FOR THE WEST <br /> CONNECTION. 1 <br /> Structure ID StrTyp Activity Compl Date Comments 2. <br /> WML1484X01 WAMAIN <br /> I <br /> Address 2201 100TH ST SW = <br /> F. <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference i <br /> Location t <br /> E <br /> I <br /> i <br /> I <br /> E <br /> E <br /> i <br /> i <br /> i <br /> i <br /> i <br /> 1 <br /> . <br /> 1 <br /> i <br /> s <br /> 1 <br />