Laserfiche WebLink
I- fupubw1 I''C&IfUIL -Hu YJItIII <br /> tail-tail vi�s and Insurance roup 1:Major Item ode Groups <br /> :imator:John McCanna/Dan Radder <br /> rject Size:20680 SF <br /> ItemCode Description Quantity UM TotalCost <br /> Concrete <br /> 0305.100 Concrete Accessories 1.00 LS 12,500.00 <br /> 0310.005 Spread Ftg.Layout 27.00 EA 1,025.77 <br /> 0310.010 Spread Ftg.Fine Grading 1,101.00 SF 167.35 <br /> 0310.015 Spread Ftg.Form Fabrication 1,114.00 SF 2,228.00 <br /> 0310.020 Spread Ftg.Form Set/Strip 1,114.00 SF 8,464.51 <br /> 0310.025 Spread Ftg.Anchor Bolt Templates 27.00 EA 102.58 <br /> 0310.030 Spread Ftg.Conc.Placement- 64.00 CY 9,548.02 <br /> 0310.035 Spread Ftg.Float Finish Tops 958.00 SF 727.89 <br /> 0310.040 Spread Ftg.Anchor Bolt Install 108.00 EA 2,991.22 <br /> 0314.005 Cont.Ftg.Layout 548.00 LF 208.19 <br /> 0314.010 Cont.Ftg.Fine Grading 1,138.00 SF 172.98 <br /> 0314.015 Cont.Ftg.Form Fabrication 1,138.00 SF 2,276.00 <br /> 0314.020 Cont.Ftg.Form Set/Strip 1,138.00 SF 6,917.45 <br /> 0314.030 Cont.Ftg.Conc.Placement- 49.60 CY 7,588.15 <br /> 0314.035 Cont.Ftg.Float Finish Tops 1,138.00 SF 864.65 <br /> 0318.005 B.G.Wall Layout 168.00 LF 63.82 <br /> 0318.010 B.G.Wall Plywood/Lumber Material 2,157.00 SF 4,314.00 <br /> 0318.021 B.G.Wall Plywood Form Set/Strip 2,157.00 SF 8,194.66 <br /> 0318.025 B.G.Wall Blockout Set/Strip 4.00 EA 607.86 <br /> 0318.030 B.G.Wall Conc.Placement- 26.30 CY 4,023.56 <br /> 0318.035 B.G.Wall Wet Finish Tops 113.00 SF 85.86 <br /> 0318.060 B.G.Wall Point&Patch 840.00 SF 1,276.46 <br /> 0319.005 Plinth Layout 27.00 EA 1,025.77 <br /> 0319.010 Plinth Plywood/Lumber Material 467.00 SF 934.00 <br /> 0319.020 Plinth Handset Form Set/Strip 467.00 SF 1,774.18 <br /> 0319.030 Plinth Conc.Placement- 8.30 CY 1,269.79 <br /> 0319.035 Plinth Point&Patch 324.00 SF 246.18 <br /> 0321.005 S.O.G.Layout 20,680.00 SF 1,571.68 <br /> 0321.006 S.O.G.Granular Fill/Cap Break 615.00 TN 9,980.16 <br /> 0321.007 S.O.G.Moisture Barrier 20,680.00 SF 3,143.36 <br /> 0321.016 S.O.G.Perimeter Insulation 2,212.00 SF 4,424.00 <br /> 0321.020 S.O.G.Edge Form Set/Strip 915.00 SF 8,782.44 <br /> 0321.023 S.O.G.Drill&Epoxy C.J.Dowels 242.00 EA 6,169.94 <br /> 0321.026 S.O.G.Screed&Pin Install 1,461.00 LF 7,770.77 <br /> 0321.030 S.O.G.Conc.Placement-6"Slab 426.00 CY 47,966.88 <br /> 0321.035 S.O.G.Trowel/Broom Finish 20,680.00 SF 25,850.00 <br /> 0321.040 S.O.G.Sawcut Control Jt. 2,884.00 LF 3,605.00 <br /> 0321.050 S.O.G.Spray Sealer/Hardener 20,680.00 SF 9,882.97 <br /> 0380.100 Concrete Pump Mobilizations 5.00 EA 6,000.00 <br /> 0380.110 Concrete Pump Cubic Yards 575.00 CY 1,437.50 <br /> 0380.120 Concrete Pump Manhours 36.00 LS 4,500.00 <br /> 0382.100 Rebar Fabrication 26.00 TN 26,650.00 <br /> 0382.110 Rebar Installation 26.00 TN 19,370.00 <br /> Total Concrete 1.00 LS 266,703.56 <br /> Metals P <br /> 0511.300 Moment Frame Bracing Steel 1.00 JOB 18,996.38 <br /> 0551.035 Steel Ladder w/o Cage 1.00 EA 3,073.64 <br />