My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 100TH ST SW AD SYSTEMS 2022-03-07
>
Address Records
>
100TH ST SW
>
2201
>
AD SYSTEMS
>
2201 100TH ST SW AD SYSTEMS 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 2:19:18 PM
Creation date
3/2/2022 2:15:51 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
2201
Tenant Name
AD SYSTEMS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AD SYSTEMS EXPANSION EVERETT,WA <br /> Projects shall use Ecology's 2014 Stormwater Management Manual for Western Washington: <br /> Volume I of Section 2.5.5, Chapter 3 of Volume Ill, and Chapter 5 of Volume V to determine which <br /> on-site stormwater management BMPs shall be employed on a particular project site, and <br /> document that determination in the drainage report. <br /> Response: The geotechnical report has been attached in Appendix A for reference. Due to a shallow <br /> impermeable layer with perched groundwater and lack of dispersion area due to existing site constraints, the <br /> LID requirements have been determined to be infeasible. On-site storm water runoff will be collected and <br /> . transported via a system of catch basins and underground storm pipes to the existing storm pond. No <br /> changes to the existing stormwater quality and quantity facilities are proposed. <br /> See below for the flow chart for determining LID MR#5 requirements: <br /> Row Chart for Determining UD MR#5 Requirements <br /> Does the project discharge to Flow Crmhul Exempt Waters <br /> (per Minimum Requirement(MR)NT)?Yes <br /> (4E;QUIR{PLlmptement the following BMus No <br /> where feasible: Does the project trigger only MRs No,the project <br /> BMP 15.13:Post•Corssr uction Sal - lip-PS?(Per Figure 3,2 or Figure triggered only <br /> Quality and Depth 33 in Appendix 1 of the 2013.2018 MR 02 No additional <br /> BMP 15.10A.B.or C;Downspout Full WWA Phase 11 Permit&Phase I requirements <br /> Inhltrabon,Downspout Dispersion permit.{ <br /> Systems,or Perforated Stub-out <br /> Connections / No,the project <br /> • BMP T5.11 or TS:12:Concentrated flaw „triggered Mils pl-k9, <br /> Dispersion or Sheet Flow Dispersion Yes <br /> Is the project inside the UGA? <br /> NOT REQUIRED:Achievement of the LID <br /> Performance Standard.Applying the other / No,the project is <br /> BMPs in List Pl or List N o2. aside the UGA. <br /> Yes <br /> Did the project developer choose to meet the • <br /> LID Performance Standard? k the project on a parcel of <br /> 5 acres or larger? <br /> No,project developer No <br /> chose List p1., Yes Yes <br /> Did the project developer <br /> $Ef21lIRED;For each surface, choose to meet the LID REQUIRED;Meet the LID <br /> consider the BMPs In the order <br /> Performance Standard? Performance Standard through the <br /> listed in List 81 for that type of <br /> surface.Use the first BMP that is use of 9L'Y E{MP(sj in the 2014 <br /> considered feasible. Yes SW W MMW except for Pain Gardens <br /> No,project (the use of Bioretenton n <br /> NOT REQUIRED:Achievement of developer acceptablrj. <br /> the LID Performance Standard, chose List PT. <br /> lithe project can't meet the LID <br /> Performance Standard,it must seek <br /> REQUIRED;Meet theft()Performance REQUIRED:For each surface, and be granted an exception I <br /> Standard through the use of any BMP(s)In consider the BMPs in the variance. <br /> the 2014 SW MMW W except for Rain Gardens order listed in List N2 for <br /> (the use of Ftioretention is acceptable). that type of surface.Use the REQUIRED:Apply BMP T5.13 Post- <br /> REQUIRED for Protects Triggering MR u1-9h first BMP that is considered Construction Solt Quality and Depth. <br /> feasible. <br /> Apply BMP T513 Post-Construcbcm Soil NOT REQUIRED;Applying the BMPs <br /> Quality and Depth, NOT REQUIRED; in List al or List 02, <br /> Achievement of the LID <br /> NOT REQUIRED;Applying the BMPs in List P1 <br /> Performance Standard. <br /> or List 42, <br /> 'Recommended by Ecology for projects triggering MR thl•5, <br /> Figure 2.5.1 —Flow Chart for Determining LID MR#5 Requirements <br /> NOVEMBER 20, 2017 STORMWATER DRAINAGE SUMMARY PAGE 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.