My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 100TH ST SW AD SYSTEMS 2022-03-07
>
Address Records
>
100TH ST SW
>
2201
>
AD SYSTEMS
>
2201 100TH ST SW AD SYSTEMS 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 2:19:18 PM
Creation date
3/2/2022 2:15:51 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
2201
Tenant Name
AD SYSTEMS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AD SYSTEMS EXPANSION EVERETT, WA <br /> • If permanent infiltration ponds are used for flow control during construction,these facilities should be <br /> protected from siltation during the construction phase. <br /> Element 4:Install Sediment Controls <br /> • Prior to leaving a construction site, or prior to discharge to an infiltration facility, stormwater runoff <br /> from disturbed areas shall pass through a sediment pond or other appropriate sediment removal <br /> BMP. Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but must <br /> meet the flow control performance standard of Element #3, bullet #1. Full stabilization means <br /> concrete or asphalt paving; quarry spalls used as ditch lining; or the use of rolled erosion products, a <br /> bonded fiber matrix product, or vegetative cover in a manner that will fully prevent soil erosion. The <br /> Local Permitting Authority shall inspect and approve areas stabilized by means other than pavement <br /> or quarry spalls. <br /> • Sediment ponds, vegetated buffer strips, sediment barriers or filters, dikes, and other BMPs intended <br /> to trap sediment on-site shall be constructed as one of the first steps in grading. These BMPs shall be <br /> functional before other land disturbing activities take place. <br /> • Earthen structures such as dams, dikes, and diversions shall be seeded and mulched according to the <br /> timing indicated in Element#5. <br /> • BMPs intended to trap sediment on site must be located in a manner to avoid interference with the <br /> movement of juvenile salmonids attempting to enter off-channel areas or drainages, often during <br /> non-storm events, in response to rain event changes in stream elevation or wetted area. <br /> Element 5:Stabilize Soils <br /> • All exposed and unworked soils shall be stabilized by application of effective BMPs that protect the <br /> soil from the erosive forces of raindrop impact and flowing water, and wind erosion. <br /> • From October 1 through April 30, no soils shall remain exposed and unworked for more than 2 days. <br /> From May 1 to September 30, no soils shall remain exposed and unworked for more than 7 days.This <br /> condition applies to all soils on site, whether at final grade or not. These time limits may be adjusted <br /> by the local permitting authority if it can be shown that the average time between storm events <br /> justifies a different standard. <br /> • Soils shall be stabilized at the end of the shift before a holiday or weekend if needed based on the <br /> weather forecast. <br /> • Applicable practices include, but are not limited to, temporary and permanent seeding, sodding, <br /> mulching, plastic covering, soil application of polyacrylamide (PAM), the early application of gravel <br /> base on areas to be paved, and dust control. <br /> • Soil stabilization measures selected should be appropriate for the time of year, site conditions, <br /> estimated duration of use, and potential water quality impacts that stabilization agents may have on <br /> downstream waters or ground water. <br /> • Soil stockpiles must be stabilized from erosion, protected with sediment trapping measures, and when <br /> possible, be located away from storm drain inlets,waterways and drainage channels. <br /> • Linear construction activities, including right-of-way and easement clearing, roadway development, <br /> pipelines, and trenching for utilities, shall be conducted to meet the soil stabilization requirement. <br /> Contractors shall install the bedding materials, roadbeds, structures, pipelines, or utilities and re- <br /> stabilize the disturbed soils so that: <br /> NOVEMBER 20, 2017 STORM WATER DRAINAGE SUMMARY PAGE 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.