Laserfiche WebLink
yw D33 <br /> 741 Marine Drive PHONE <br /> Bellingham,WA 98225 3607337318 <br /> OTeST 20611on7WAe982 3E 888251F5276 FAX <br /> 360733_7418 <br /> April 25, 2017 <br /> Project No. 17-0186 <br /> Fisher Construction Group <br /> 625 Fisher Lane <br /> Burlington,Washington 98233 <br /> Attn.: Mr.William A. Langley <br /> Re: Geotechnical Engineering Report <br /> Proposed AD Systems Expansion <br /> 2201 100th Street Southwest <br /> Everett, Washington <br /> Dear Mr. Langley: <br /> As requested, GeoTest Services, Inc. (GTS) is pleased to submit this report summarizing the <br /> results of our geotechnical evaluation for the proposed AD Systems Expansion at the above <br /> referenced address in Everett, Washington (see Vicinity Map, Figure 1). <br /> PURPOSE AND SCOPE OF SERVICES <br /> The purpose of this investigation was to evaluate general subsurface conditions beneath the <br /> site from which conclusions and recommendations pertaining to project design could be <br /> formulated. Specifically, our scope of services included the following tasks: <br /> • Exploration of soil and groundwater conditions underlying the site by advancing a total of <br /> four borings with a truck-mounted drill rig to evaluate subsurface conditions. <br /> • Laboratory testing on representative samples in order to classify and evaluate the <br /> engineering characteristics of the soils encountered. <br /> • Provide this written report containing a description of subsurface conditions, exploration <br /> logs, findings and recommendations pertaining to site preparation and earthwork, fill and <br /> compaction, wet weather earthwork, seismic design, foundation recommendations, <br /> concrete slab-on-grade construction, foundation and site drainage, utilities, temporary <br /> and permanent slopes, and construction monitoring. <br /> • Provide a general assessment of infiltration feasibility. <br /> PROJECT DESCRIPTION <br /> For this report, we were provided with a site plan showing the proposed location of a new <br /> warehouse addition in relation to the existing building. Fisher Construction Group prepared this <br /> drawing, which was revised on March 15, 2017. Based on this drawing and discussions with <br /> Mr. Seth Burwash of Fisher Construction Group, we understand that the existing parking canopy <br /> on the northwest portion of the property will be removed, and then a new, 20,000 square foot <br /> Page 1 of 13 <br />