Laserfiche WebLink
• • <br /> B2010-021—EASTMONT-Changes to Drawings <br /> • Sheet A-2:We changed the concrete pad size from 4'x 10'to 17'x 8'.The blacktop in that area <br /> was not flat so to make sure the generator was sitting level and the storm water would drain in <br /> the correct direction we proposed one large pad to fix those potential issues. <br /> • Sheet A-3:We changed the concrete pad size from 4'x 10'to 17'x 8'.The blacktop in that area <br /> was not flat so to make sure the generator was sitting level and the storm water would drain in <br /> the correct direction we proposed one large pad to fix those potential issues. <br /> ll <br /> a <br /> FEB 17 2021 <br /> CITY <br /> Per�F •ERETT <br /> ices <br />