Laserfiche WebLink
• • S2 55 —aP3 <br /> Intake &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT# <br /> BUILDING PLANNING <br /> • <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> ❑ Route to Commercial Building ❑Attach to Project No. <br /> ❑ Route to Residential Building ❑ Route to Historic Reviewer <br /> ❑ Make this a"W"Permit ❑ OK to Route to Other Departments <br /> Bldg/TI/Addn/Rem Size ❑ Hold in Planning File Drawer <br /> Garage/Accessory Struct.Size Zone v` ^ <br /> Number of Stories Overlay/Agreement NZttCX�� ,tom <br /> - R <br /> Basement El No ❑Y-s, Fin/Unfin Nonresidential Use <br /> Type of Construction Residential Use <br /> Occupancy Group Proposed No.of Dwelling Units: <br /> Occupancy Load Total No.of Dwelling Units: <br /> Fire Sprinklers: ❑Update Existing rel New System ❑Not Req'd Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Reason Sprinklers Required: "In Lieu"Fee:Type: Amount$ <br /> Fire Alarm: ❑Update [sting ❑New System ❑Not Req'd School Impact Fee: Total $ <br /> Reason Fire Alarm Re• red: Calculated: Credit: <br /> RCW 64.55 MF works.-et req'd for permit?' ❑Yes ❑ No El Everett School Dist ❑Mukilteo School Dist <br /> Add'i RCW 64.55 docs required prior to final? ❑Yes ❑No Additional Notes: <br /> VALUATION CALCULATION: Total$ 1) /2f <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Intake OK by: . Date: <br /> Additional Notes: Intake Comments: IPWWorksheet Needed if. <br /> OSys Dev Eval ❑Traffic Mit Eval <br /> OSite Work or Drainage Proposed <br /> Approved By:L' S-- Date: 3-47OBackflow Prevention for high hazard: <br /> ;(dental,medical,animals,mortuary,hospital, <br /> !supportive housing) <br /> FIRE DEPARTMENT ❑Route this folder for PW Review at end ---PW Review Worksheet <br /> Separate/Deferred Submittals Required: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> El Fire Sprinklers El Fire Alarm ❑Other: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> Additional Notes: ❑This Permit is Approved by Public Works <br /> ❑ See PW Review Worksheet and associated attached items <br /> Fire Dept.Fees: ❑A Separate PW Permit is Required (Permit#: PW <br /> ❑ Review of As-Built Plans-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Approved By: Date: ❑ Public Works has no scope---PW Not Required <br /> Additional Notes: <br /> ELECTRICAL <br /> Additional Notes: <br /> Approved By: Date: Approved By: Date: <br /> z <br />