My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 2/15/2022
>
Contracts
>
Agreement
>
Interlocal Agreements
>
WA ST Dept of Ecology 2/15/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:18 AM
Creation date
3/4/2022 11:16:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
2/15/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
John Rabenow
Subject / Project Title
Nutrient General Program Discharge Permit
Tracking Number
0003215
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Review non-residential sources of nitrogen and identify any possible <br /> pretreatment opportunities. <br /> b. Identify potential strategies for reducing TIN from new multi-family/dense <br /> residential developments and commercial buildings. <br /> D. ACTION LEVEL EXCEEDANCE CORRECTIVE ACTIONS <br /> Permittees in Table 5 must evaluate whether or not they exceeded the facility specific <br /> action level or the bubbled action level (as applicable) and, if they did, implement <br /> corrective actions while continuing optimization. <br /> 1. If the Permittee determines in the Annual Report that they have exceeded their <br /> action level, they must: <br /> a. Identify possible factors that caused the action level exceedance. <br /> b. Identify whether modifications to the optimization strategy can improve <br /> performance. <br /> c. Assess whether a different strategy or combination of strategies may provide <br /> better overall process improvements. <br /> d. Document changes made to the optimization strategy, if any, while <br /> completing corrective action requirements. <br /> i. Provide a detailed description of the modified or new optimization <br /> strategy selected from the list developed in S4.C.1.b. Include an <br /> implementation schedule for any changes and, as necessary, use the <br /> treatment process assessment developed to evaluate anticipated results. <br /> ii. If the Permittee proposes no changes to the optimization strategy, they <br /> must provide reasons for not making changes. <br /> 2. With the next Annual Report, submit for review a proposed approach to reduce <br /> the annual effluent load by at least 10% below the action level listed in Table 5 <br /> for individual plants or Table 6 for multiple plants under a bubbled action level. <br /> This must be an abbreviated engineering report or technical memo, unless <br /> Ecology has previously approved a design document with the proposed solution. <br /> The proposed approach must utilize solutions that can be implemented as soon <br /> as possible. This may include influent load reduction strategies identified in <br /> S4.C.3. <br /> The engineering document must include: <br /> i. Brief summary of the treatment alternatives considered and why the <br /> proposed approach was selected. Include cost estimates for operation <br /> and maintenance; <br /> ii. The basic design information, including influent characterization; <br /> iii. A description of the proposed treatment approach and operation, <br /> including updates to the WWTP's process flow diagram; <br /> Puget Sound Nutrient General Permit Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.