Laserfiche WebLink
1. Treatment Process Performance Assessment <br /> Assess the nitrogen removal potential of the current treatment process and <br /> identify viable optimization strategies prior to implementation. <br /> a. Treatment Assessment. Develop a method to evaluate potential optimization <br /> approaches for the existing treatment process. Use the evaluation to: <br /> i. Evaluate current (pre-optimization) process performance to determine <br /> the existing TIN removal performance for the WWTP. <br /> ii. Create a list of potential optimization strategies capable of meeting the <br /> action level at the WWTP prior to starting optimization. Update the <br /> assessment and list of options as necessary with each Annual Report. <br /> b. Identify and evaluate optimization strategies. From the list developed in <br /> S5.C.1.a.ii, identify viable optimization strategies for each WWTP owned and <br /> operated by the Permittee. Prioritize and update this list as necessary to <br /> continuously maintain a working set of strategies for meeting the action level <br /> with the existing treatment processes. <br /> The Permittee may exclude any optimization strategy from the initial list <br /> created in S5.C.a.ii that was considered but found to exceed a reasonable <br /> implementation cost or timeframe. Documentation must include an <br /> explanation of the rationale and financial criteria used in the exclusion <br /> determination. If the Permittee finds no viable optimization strategies exist <br /> for their current treatment processes, they must immediately proceed to the <br /> identification of a corrective action under S5.D. <br /> c. Initial Selection. As soon as possible and no later than July 1, 2022 select at <br /> least one optimization strategy for implementation. <br /> Document the expected performance (i.e., %TIN removal or a calculated <br /> reduction in effluent load or concentration) for the initial optimization <br /> strategy prior to implementation. <br /> 2. Optimization Implementation <br /> All Permittees in Table 8 must document implementation of the selected <br /> optimization strategy (from S5.C.1.c) during the first reporting period in the first <br /> Annual Report due March 31, 2023. Permittees must document implementation <br /> during every reporting period thereafter. The documentation must include: <br /> a. Strategy Implementation. Describe how the permittee implemented the <br /> selected strategy during each reporting period, following permit coverage. <br /> Including: <br /> i. Initial implementation costs <br /> ii. Length of time for full implementation, including start date. <br /> Puget Sound Nutrient General Permit Page 21 <br />