My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 2/15/2022
>
Contracts
>
Agreement
>
Interlocal Agreements
>
WA ST Dept of Ecology 2/15/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:18 AM
Creation date
3/4/2022 11:16:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
2/15/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
John Rabenow
Subject / Project Title
Nutrient General Program Discharge Permit
Tracking Number
0003215
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G3. RIGHT OF INSPECTION AND ENTRY <br /> The Permittee must allow an authorized representative of Ecology, upon the presentation <br /> of credentials and such other documents as may be required by law: <br /> A. To enter upon the premises where a discharge is located or where any records are kept <br /> under the terms and conditions of this permit. <br /> B. To have access to and copy—at reasonable times and at reasonable cost-- any records <br /> required to be kept under the terms and conditions of this permit. <br /> C. To inspect—at reasonable times—any facilities, equipment (including monitoring and <br /> control equipment), practices, methods, or operations regulated or required under this <br /> permit. <br /> D. To sample or monitor—at reasonable times—any substances or parameters at any <br /> location for purposes of assuring permit compliance or as otherwise authorized by the <br /> Clean Water Act. <br /> G4.GENERAL PERMIT MODIFICATION AND REVOCATION <br /> This permit may be modified, revoked and reissued, or terminated in accordance with the <br /> provisions of Chapter 173-226 WAC. Grounds for modification, revocation and reissuance, <br /> or termination include, but are not limited to, the following: <br /> A. When a change occurs in the technology or practices for control or abatement of <br /> pollutants applicable to the category of dischargers covered under this permit. <br /> B. When effluent limitation guidelines or standards are promulgated pursuant to the CWA <br /> or Chapter 90.48 RCW, for the category of dischargers covered under this permit. <br /> C. When a water quality management plan containing requirements applicable to the <br /> category of dischargers covered under this permit is approved, or <br /> D. When information is obtained that indicates cumulative effects on the environment <br /> from dischargers covered under this permit are unacceptable. <br /> G5. REVOCATION OF COVERAGE UNDER THE PERMIT <br /> Pursuant to Chapter 43.21B RCW and Chapter 173-226 WAC, the Director may terminate <br /> coverage for any discharger under this permit for cause. Cases where coverage may be <br /> terminated include, but are not limited to, the following: <br /> A. Violation of any term or condition of this permit. <br /> B. Obtaining coverage under this permit by misrepresentation or failure to disclose fully <br /> all relevant facts. <br /> C. A change in any condition that requires either a temporary or permanent reduction or <br /> elimination of the permitted discharge. <br /> D. Failure or refusal of the Permittee to allow entry as required in RCW 90.48.090. <br /> Puget Sound Nutrient General Permit Page 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.