My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mukilteo Water and Wastewater District 1/3/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
Mukilteo Water and Wastewater District 1/3/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:11 AM
Creation date
3/11/2022 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Mukilteo Water and Wastewater District
Approval Date
1/3/2022
Council Approval Date
12/22/2021
End Date
6/30/2024
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
Temporary Biosolids Storage
Tracking Number
0003225
Total Compensation
$750.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Operations Superintendent or designee) will notify MUKILTEO in writing of the <br /> results of this inspection. If further action is necessary, the City will notify MUKILTEO <br /> of the time frame for further removal and clean up. If MUKILTEO fails to take further <br /> action within the timeframe specified or provide adequate cause as to why such further <br /> action cannot be accomplished within the timeframe specified, the City will take the <br /> necessary action to restore the site to its original condition through any means the <br /> City deems necessary. All costs associated with these activities will be paid by <br /> MUKILTEO. <br /> M. MUKILTEO is responsible for any damage to any City equipment, appurtenance, or <br /> property caused by its activities at the site and shall schedule and complete repairs <br /> as soon as possible, at its expense. MUKILTEO will submit a repair schedule to the <br /> City's Operation Superintendent within 72 hours from the time damage occurred or <br /> is initially noted by MUKILTEO or City personnel. Any repair work must be pursuant <br /> to plans acceptable to the City and must be accomplished with parts, materials, and <br /> labor approved by City personnel. Upon completion of any necessary repairs, <br /> MUKILTEO will submit a written statement verifying that the repair work has been <br /> completed according to the approved repair schedule. If the repair work is not <br /> acceptable, the City's Operations Superintendent may have the repair work <br /> performed by City personnel or another private entity. All costs for this repair work will <br /> be paid by MUKILETO. <br /> 101Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.