My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Landau Associates Inc. 2/11/2022
>
Contracts
>
6 Years Then Destroy
>
2022
>
Landau Associates Inc. 2/11/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 3:40:08 PM
Creation date
3/11/2022 3:38:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Landau Associates Inc.
Approval Date
2/11/2022
Council Approval Date
2/9/2022
End Date
12/22/2022
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Environmental Services - Combined Sewer Main
Tracking Number
0003233
Total Compensation
$203,100.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L4LANDAU5 <br /> EXHIBIT A <br /> January 19, 2022 <br /> City of Everett Public Works <br /> 3200 Cedar Street <br /> Everett,WA 98102 <br /> Attn: Mr. Souheil Nasr, PE <br /> Transmitted via email to:SNasr@everettwa.gov <br /> Re: Environmental Support—Scope and Estimated Cost <br /> Port of Everett Combined Sewer Main Improvements <br /> Everett,Washington <br /> Dear Mr. Nasr: <br /> Landau Associates, Inc. (LAl) is pleased to submit this proposal for environmental support services to <br /> the'City of Everett(City)for the Port of Everett(Port) Combined Sewer Main Improvements project <br /> (the project).The project will be conducted at the Port within a construction easement granted by the <br /> Port, and crosses two Washington State Department of Ecology(Ecology) Model Toxics Control Act <br /> (MTCA) cleanup sites:the Kimberly-Clark Worldwide Site(K-C Site)and the ExxonMobil/ADC Site <br /> (Exxon/ADC Site). LAI's first primary objective is to document environmental conditions encountered <br /> by the City during construction of the project to support any coordination between the City and the <br /> Port in the event that unanticipated hazardous materials are encountered. LAI's second primary <br /> objective is to support the City's implementation of the project in accordance with the K-C Site Soil <br /> and Groundwater Management Plan and the Exxon/ADC Site Soil and Groundwater Management <br /> Plans (SGMPs; LAI 2021a, 2021b).These SGMPs were prepared by LAI for the Port to guide intrusive <br /> activities within each cleanup site during marine terminal improvements(MIE project) being <br /> conducted by the Port,and they were subsequently adopted by the City for use during the project. <br /> The project is expected to be conducted from late March through June 2022 and will occur <br /> concurrently with the Port's MIE project, which LAI is also supporting for the Port. MIE project support <br /> includes documenting environmental conditions within the construction easement and supporting <br /> implementation of the SGMPs. LAI understands both the City and Port concur that LAI providing <br /> environmental support on both projects is beneficial to both parties and does not represent a conflict <br /> of interest. <br /> The following sections present the proposed scope and budget,which consists of the following tasks: <br /> • Construction Engineering Support <br /> • Ecology Coordination <br /> 155 NE 100th St,Ste 302 • Seattle,WA 98125 • 206.631.8680 • www.landauinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.