My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Landau Associates Inc. 2/11/2022
>
Contracts
>
6 Years Then Destroy
>
2022
>
Landau Associates Inc. 2/11/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 3:40:08 PM
Creation date
3/11/2022 3:38:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Landau Associates Inc.
Approval Date
2/11/2022
Council Approval Date
2/9/2022
End Date
12/22/2022
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Environmental Services - Combined Sewer Main
Tracking Number
0003233
Total Compensation
$203,100.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LALANDAU <br /> ASSOCIA TES <br /> EXHIBIT B <br /> Port of Everett Combined Sewer Improvements Environmental <br /> Support—Estimated Cost <br /> The estimated budget is detailed in the table below and is based on the information provided to <br /> Landau Associates, Inc.(LAI),our previous experience with similar projects,and on the assumptions <br /> stated in Exhibit A. If unforeseen conditions are encountered or out-of-scope work or level of effort <br /> are anticipated,we will bring these to your attention and seek modification to the scope of services <br /> and budget, as appropriate. LAI will not exceed the total estimated fee for the above-described <br /> services without prior authorization from the City. LAI's services will be provided on a time-and- <br /> expenses basis in accordance with the attached compensation schedule,which represents an <br /> approximately 5 percent discount of current LAI rates. <br /> LAI recognizes that some of the scoped efforts may be duplicated when LAI supports both the City and <br /> Port projects; in particular,these costs assume full-time on-site support during construction. <br /> Efficiencies may be realized when the City and Port projects are implemented concurrently, and one <br /> LAI field staff member is adequate to support on-site needs of both. LAI costs to both the City and the <br /> Port will be proportional to the level of effort required. LAI will work to staff the project appropriately <br /> based on the needs of both the City and Port projects. <br /> Scope of Services Cost <br /> Task 011:Construction Engineering Support $14,100 <br /> Task 012:Ecology Coordination $7,500 <br /> Task 013:On-Site Construction Support $133,000 <br /> NOTE:This task assumes full time,on-site support for 13 weeks,resulting in an LAI field support <br /> labor estimate of$97,000;see description of opportunities for efficiencies and subsequent <br /> reduction in actual costs in the above paragraph. <br /> This total also Includes$15,400 for subcontracted waste characterization analytical costs and <br /> $6,400 for subcontracted unanticipated contamination characterization analytical costs. <br /> Task 014:Reporting $12,900 <br /> Task 015:Project Management $17,100 <br /> Task 016:Unanticipated Support $18,500 <br /> TOTAL ! $203,100 <br /> 155 NE 100th St,Ste 302 • Seattle,WA 98125 • 206,631.8680 • www.landauinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.