My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8215 BROADWAY CROWN CASTLE ANTENNA 2022-03-23
>
Address Records
>
BROADWAY
>
8215
>
CROWN CASTLE ANTENNA
>
8215 BROADWAY CROWN CASTLE ANTENNA 2022-03-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 1:13:14 PM
Creation date
3/17/2022 11:42:35 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
8215
Tenant Name
CROWN CASTLE ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES <br />1. ALL WORK SHALL COMPLY WITH THE ANSI/TIA-222-H, ANSI/ASSP A10.48, AND ANY OTHER GOVERNING BUILDING CODES AND OSHA <br />SAFETY REGULATIONS. <br />2. ALL WORK INDICATED ON THE DRAWINGS SHALL BE PERFORMED BY QUALIFIED CONTRACTORS EXPERIENCED IN TELECOMMUNICATIONS <br />TOWER, POLE AND FOUNDATION CONSTRUCTION. <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND FABRICATION OF ALL MISCELLANEOUS PARTS (SUCH AS SHIMS), <br />TEMPORARY SUPPORTS, AND GUYINGS, ETC., PER ANSI/ASSP A10.48, TO COMPLETE THE ASSEMBLY AS SHOWN IN THE DRAWINGS. <br />4. CONTRACTOR SHALL PROCEED WITH THE INSTALLATION WORK CAREFULLY SO THE WORK WILL NOT DAMAGE ANY EXISTING CABLE, <br />EQUIPMENT OR THE STRUCTURE. <br />5. THE USE OF GAS TORCH OR WELDER, ARE NOT ALLOWED ON ANY TOWER STRUCTURE WITHOUT THE CONSENT OF THE TOWER <br />OWNER. <br />6, GENERALLY THE CONTRACTOR IS RESPONSIBLE TO CONDUCT AN ONSITE VISIT SURVEY OF THE JOB SITE AFTER AWARD, AND <br />REPORT ANY ISSUES WITH THE SITE TO TES BEFORE PROCEEDING CONSTRUCTION. <br />7. IT IS THE RESPONSIBILITY OF THE GC TO VERIFY THAT THERE IS NO INTERFERENCES (WITH SAFETY CLIMB BRACKETS, TRANSMISSION <br />LINES, ETC.) PRIOR TO MOBILIZATION AND INSTALLATION OF THESE MODIFICATIONS. <br />8. PLEASE NOTIFY TES IMMEDIATELY IF ANY INSTALLATION ISSUES OCCUR RELATED TO THIS DRAWING @ 972-483-0607 OR <br />EMAIL-TESORDERS@TESTOWER.US <br />FABRICATION <br />1. ALL STEEL SHALL MEET OR EXCEED THE MINIMUM STRENGTH AS SPECIFIED IN THE DRAWINGS. IF YIELD STRENGTH WAS NOT NOTED <br />IN THE DRAWINGS, CONTRACTORS SHALL CONTACT TES FOR DIRECTION. <br />2. ALL FIELD CUT EDGES SHALL BE GROUND SMOOTH. ALL FIELD CUT AND DRILLED SURFACES SHALL BE REPAIRED WITH A MINIMUM <br />OF TWO COATS OF ZINGA COLD GALVANIZING COMPOUND PER ASTM A780 AND MANUFACTURER'S RECOMMENDATIONS. <br />WELDING <br />1. ALL WELDING SHALL BE PERFORMED BY AWS CERTIFIED WELDERS AND IN ACCORDANCE WITH THE LATEST EDITION OF THE AWS <br />WELDING CODE D1.1. ALL ELECTRODES TO BE LOW HYDROGEN, MATCHING FILLER METAL, PER AWS D1.1, UNO. (E70XX UNLESS <br />NOTED OTHERWISE). <br />2. PRIOR TO FIELD WELDING GALVANIZED MATERIAL, CONTRACTOR SHALL GRIND OFF GALVANIZING APPROX. 0.5" BEYOND THE <br />PROPOSED FIELD WELD SURFACES. <br />3. ALL WELDS SHALL BE INSPECTED VISUALLY. A MINIMUM OF 25% OF WELDS SHALL BE INSPECTED WITH DYE PENETRANT OR <br />MAGNETIC PARTICLE TO MEET THE ACCEPTANCE CRITERIA OF AWS D1.1. 100% OF WELDS SHALL BE INSPECTED IF DEFECTS ARE <br />FOUND. <br />4. WELD INSPECTIONS SHALL BE PERFORMED BY AN AWS CERTIFIED WELD INSPECTOR. <br />5. AFTER INSPECTION, ALL FIELD WELDED SURFACES SHALL BE REPAIRED WITH A MINIMUM OF TWO COATS OF ZINGA COLD <br />GALVANIZING COMPOUND PER ASTM A780 AND MANUFACTURER'S RECOMMENDATIONS, <br />BOLTED ASSEMBLIES AND TIGHTENING OF CONNECTIONS <br />1. ALL HIGH STRENGTH BOLTS SHALL CONFORM TO THE PROVISIONS OF THE SPECIFICATIONS FOR STRUCTURAL JOINTS USING A325 <br />OR A490 BOLTS AS APPROVED BY THE RCSC. <br />2. FLANGE BOLTS SHALL BE TIGHTENED BY THE AISC "TURN -OF -THE -NUT" METHOD. THE FOLLOWING TABLE SHOULD BE USED FOR <br />THE "TURN -OF -THE -NUT" TIGHTENING. <br />3. SPLICE BOLTS AND ALL OTHER BOLTS IN BEARING TYPE CONNECTIONS SHALL BE TIGHTENED TO A SNUG -TIGHT CONDITION, <br />4. THE SNUG -TIGHT CONDITION IS DEFINED AS THE TIGHTNESS ATTAINED BY EITHER A FEW IMPACTS OF AN IMPACT WRENCH OR THE <br />FULL EFFORT OF AN IRONWORKER WITH AN ORDINARY SPUD WRENCH TO BRING THE CONNECTED PLIES INTO FIRM CONTACT. <br />5. HB HOLLO-BOLT SHALL BE INSTALLED PER ICC ESR-3330 INSTRUCTIONS. <br />VERIFICATION AND INSPECTION <br />1. IF APPLICABLE, VERIFICATION INSPECTION TO BE PERFORMED SHALL BE IN ACCORDANCE TO IBC-2018 SECTION 1705.2 FOR STEEL <br />CONSTRUCTION AND TABLE 1705.3 FOR CONCRETE CONSTRUCTION. <br />TABLE 8.2 NUT ROTATION FROM SNUG -TIGHT <br />CONDITION FOR TURN -OF -NUT PRETENSIONING°'b <br />DISPOSITION OF OUTER FACE OF BOLTED PARTS <br />BOLT LENGTH` <br />BOTH FACES <br />ONE FACE NORMAL TO <br />BOLT AXIS, OTHER <br />BOTH FACES SLOPED <br />NOT MORE THAN 1:20 <br />NORMAL <br />BOLT AXIS <br />SLOPED NOT MORE THAN <br />FROM NORMAL TO BOLT <br />1:20 d <br />AXIS d <br />NOT MORE THAN <br />4db <br />1/3 TURN <br />TURN 1/2 <br />/ <br />2 3 TURN <br />/ <br />MORE THAN 4db <br />BUT NOT MORE <br />1/2 TURN <br />2/3 TURN <br />5/6 TURN <br />THAN 8db <br />MORE THAN 8db <br />BUT NOT MORE <br />2/3 TURN <br />5/6 TURN <br />1 TURN <br />THAN 12db <br />° NUT ROTATION IS RELATIVE TO BOLT REGARDLESS OF THE ELEMENT (NUT OR BOLT) <br />BEING TURNED. FOR REQUIRED NUT ROTATIONS OF 1/2 TURN AND LESS, THE <br />TOLERANCE IS PLUS OR MINUS 30 DEGREES; FOR REQUIRED NUT ROTATIONS OF <br />2/3 TURN AND MORE, THE TOLERANCE IS PLUS OR MINUS 45 DEGREES. <br />b APPLICABLE ONLY TO JOINTS IN WHICH ALL MATERIAL WITHIN THE GRIP IS STEEL. <br />a WHEN THE BOLT LENGTH EXCEEDS 12d6, THE REQUIRED NUT ROTATION SHALL BE <br />DETERMINED BY ACTUAL TESTING IN A SUITABLE TENSION CALIBRATOR THAT <br />SIMULATES THE CONDITIONS OF SOLIDLY FITTING STEEL. <br />d BEVELED WASHER NOT USED. <br />SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS, JUNE 30, 2004 <br />RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS <br />INSTALLATION TORQUE REQUIRED FOR HOLLO BOLTS AND AJAX BOLTS: <br />1. HB12 HOLLO BOLT: 59 FT-LBS <br />2. HB16 HOLLO BOLT: 140 FT-LBS <br />3. H820 HOLLO BOLT: 221 FT-LBS <br />4. M20 AJAX BOLT: 280 FT-LBS. <br />FIELD HOT WORK PLAN NOTES: <br />FOLLOWING GUIDELINES SHALL BE COMPLIED WITH: <br />1. CONTRACTOR'S RESPONSIBILITY TO COMPLETE A HOT WORK PLAN IF AWARDED PER CUSTOMER <br />SPECIFICATIONS GUIDELINES FOR WELDING, CUTTING & SPARK PRODUCING WORK. <br />2. HAVE A FIRE PLAN APPROVED BY THE CUSTOMER AND THEIR SAFETY MANAGEMENT DEPT. <br />3. CONTRACTOR MUST OBTAIN THE CONTACT INFO OF THE LOCAL FIRE DEPARTMENT AND THE 911 <br />ADDRESS OF THE TOWER SITE BEFORE CONSTRUCTION. <br />4, CONTRACTOR SHALL MAKE SURE THAT CELL PHONE COVERAGE IS AVAILABLE IN THE TOWER SITE. IF <br />CELL COVERAGE IS NOT AVAILABLE, AN IMMEDIATE AVAILABLE MEANS OF DIRECT COMMUNICATION WITH <br />THE FIRE DEPARTMENT SHALL BE DETERMINED PRIOR TO CONSTRUCTION START. <br />5. ALL CONSTRUCTION SHALL BE PERFORMED UNDER WIND SPEED LESS THAN 10 MPH ON THE GROUND <br />LEVEL. IF WIND SPEED INCREASE, CONTRACTOR MUST DETERMINE IF CONSTRUCTION SHALL BE <br />DISCONTINUED. <br />6. FIRE SUPPRESSION EQUIPMENT MUST BE MADE AVAILABLE ON SITE AND READY TO USE. <br />7. CONTRACTOR SHALL ASSIGN A FIRE WATCHER TO PERFORM FIRE -FIGHTING DUTIES. <br />8. ALL WELDERS SHALL BE AWS OR STATE CERTIFIED. THEY MUST ALSO BE EXPERIENCED IN WELDING ON <br />GALVANIZED MATERIALS. <br />9. IF IT IS POSSIBLE, ALL EXISTING COAX NEAR WELDING AREA SHALL BE TEMPORARILY MOVED AWAY <br />FROM THE WELDING AREA BEFORE WELDING THE PLATES. <br />10. PLEASE REPORT ANY FIELD ISSUE TO TES @ 972-483-0607. <br />CITY ®F EVERETT <br />REVIEWED FOR PERMIT <br />TES <br />Tower Engineering Solutions <br />1320 GREENWAY DRIVE, SUITE 600 <br />IRVING, TX 75038 <br />PH: 972 483-0607 <br />vreirizon <br />V1111W <br />TES JOB NO: <br />10049003 <br />CUSTOMER SITE NO: <br />471496-VZW <br />CUSTOMER SITE NAME: <br />TIMBER -HILL - A <br />8215 BROADWAY <br />EVERETT, WA 98203 <br />DRAWN BY:SP CHECKED BY: ID/CHLE <br />REV. DESCRIPTION BY DATE <br />A FIRST ISSUE SP 03 12 21 <br />0 <br />_ <br />A <br />SHEET TITLE: <br />GENERAL NOTES <br />This drawing/document is the property of <br />Tower Engineering Solutions, I.I.C. Information <br />contained herein is considered confidential in <br />nature and is to be used only for the <br />specific site that it was intended for. <br />Reproduction, transmission, publication or <br />disclosure by any method is prohibited <br />except by express written permission from <br />Tower Engineering Solutions, I.L.C. Without <br />exception, the information on this <br />drawing/document remains the property of <br />Tower Engineering Solutions, LLC. <br />SHEET NUMBER: <br />REV #: <br />GN-1 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.