My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2216 CHESTNUT ST 2022-03-23
>
Address Records
>
CHESTNUT ST
>
2216
>
2216 CHESTNUT ST 2022-03-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 1:26:19 PM
Creation date
3/17/2022 2:00:06 PM
Metadata
Fields
Template:
Address Document
Street Name
CHESTNUT ST
Street Number
2216
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/19/2022 <br />City of Everett <br />Page 1112- <br />7:15:38AM s <br />INSPECTION ACTIVITY REPORT <br />4 <br />Permit No. B 1907-008 <br />Site Address 2216 CHESTNUT ST <br />Applied 7/9/2019 <br />Applicant MALLORY RICHARD <br />Lot <br />Approved 9/5/2019 <br />Owner LAIGO JASON R & LINDSAY F <br />Block <br />Issued 9/9/2019 <br />Contractor MALLORY CONTRACTING LLC <br />Tract <br />Parent Permit No. <br />Description ADD SECOND STORY <br />Notes <br />Scheduled ComDleted <br />TVDe Inspector Result Remarks <br />Inspector's Comments <br />10/1/2019 10/1/2019 <br />BLDG DWF APPROVAL <br />02-FOOTING/SETB <br />11/6/2019 11/6/2019 <br />BLDG DWF PARTIALAPPR <br />(11/6/2019 3:26 PM DWF) <br />07-EXTERIOR <br />Exterior siding only subject to install <br />galvanized nails into P/T bottom plate. <br />Then ok to cover, siding. <br />1/23/2020 1/23/2020 <br />BLDG DWF CORRECTION <br />(1/23/2020 12:40 PM DWF) <br />08-FRAMNG <br />Corrections- need height survey at framing. <br />Install all SDS screws in post/beam <br />brackets. <br />Install A35 or equal brackets for positive <br />connection at stairstringers. <br />Need truss/rafter plans for bracing <br />requirements. <br />SW upstairs bedroom window needs <br />opening height at 44" or < less than for <br />egress. <br />Garage trusses need to have at least an <br />H-clip or twist ties on every other <br />truss/rafter to top plate. <br />2/5/2020 2/5/2020 <br />BLDG DWF APPROVAL as noted <br />2/3/2020 10:23 AM MALLORY <br />08-FRAMING <br />CONTRACTING LLC <br />Contact Name: MALLORY <br />CONTRACTING LLC <br />Site Address: 2216 CHESTNUT ST <br />Phone:2064785001 <br />e-Mail: <br />R@MALLORYCONTRACTING. COM <br />(2/5/2020 10:36 AM DWF) <br />Contractor to install bracing on truss rafter <br />c4 as per plans. <br />Ok to insulate <br />2/10/2020 2/10/2020 BLDG DWF CORRECTION eTRAKiT Inspection 2/8/2020 11:08 AM MALLORY <br />l l-INSULATION Request CONTRACTING LLC <br />Contact Name: MALLORY <br />CONTRACTING LLC <br />Site Address: 2216 CHESTNUT ST <br />Phone:2064785001 <br />e-Mail: <br />R@MALLORYCONTRACTING.COM <br />(2/10/2020 9:48 AM DWF) <br />Not complete. <br />Contractor needs to fill all voids, insulate <br />headers with R-10 ridged foam. <br />Install eve vents in attic as per design. <br />INSP12 CIMSYS EMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.