Laserfiche WebLink
• <br />2021 Stormwater System Development <br />Fee Calculations <br />Permit M2101-115 <br />Additional Notes: <br />Project Address: 2131 Lake Heights Dr <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: Outdoor Freezer <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: AH Date: 3/18/2021 <br />Outside City Limits? No *Adds a 25%Surcharge <br />Supportive Housing Credit? JNo *Reduces by 80% <br />1 Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit#: PW2103-043 Type of Construction: Existing Development Adding New+ Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />341 SF <br />Stormwater System Dev Fee: <br />$89.75 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PWXXXX-XXX Type of Construction: Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />