Laserfiche WebLink
Intake & Approval Sheet *(FOR PERMIT STAFF ONLY) 0 PERMIT # &U Z603'0 j <br />BUILDING <br />Intake OK by:Citk Date:��_ <br />Intake Comments: <br />❑ Route to Commercial Building <br />R Route to Residential Building <br />91 Make this a "W" Permit <br />Bldg/TI/Add e Size <br />Z �� <br />Garage/Accessory Struct. Size <br />Number of Stories <br />2 <br />Basement <br />[]No WYes , Fin / n i <br />Type of Construction <br />Occupancy Group <br />Occupancy Load <br />Fire Sprinklers: ❑Update Existing ❑New System []Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ❑Update Existing ❑New System ❑Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes No <br />Add'I RCW 64.55 docs required prior to final? ❑Yes JgNo <br />VALUATION CALCULATION: Total $9.¢ <br />Additional Notes: 20/,157- /a2 C <br />Approved By: Date: 3 Zo <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required: <br />El Fire Sprinklers ❑Fire Alarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑ Review of As -Built Plans - NO FIRE FEE <br />❑ Minimal or No Fire Scope - NO FIRE FEE <br />❑ Review / Inspection Scope - ADD FIRE FEE <br />Approved By: Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by. Assign To Date: <br />Intake Comments: 12 <br />❑ Attach to Project No. <br />❑ oute to Historic Reviewer <br />OK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Zone <br />—2 <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />2 <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />0— <br />PlanningLLandscape Inspection Required before Final? ❑Yes <br />"In Lieu" Fee: ount $ <br />School Impact Fee: To <br />Calculated: t: <br />❑ School Dist ❑Mukilteo School <br />Additional Notes: <br />Approved By:! Date: <br />PUBLIC WORKS <br />Intake OK by: Date: 207-0 <br />___................... .................._.._._......._...........................-..-................._...... <br />Intake Comments,:{, PW Worksheet Needed if., <br />❑Sys Dev Eval ❑Traffic Mit Eval <br />I❑Site Work or Drainage Proposed <br />❑Backflow Prevention for high hazard: <br />:(dental, medical, animals, mortuary, hospital, <br />'supportive housing) <br />..._ ........_...,._ .._ _ ._..._._...._ —_ _ .......... <br />❑ Route this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br />❑ This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder (join with this folder for permit issuance) <br />❑ WIII be Issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />Public Works has no scope --- PW Not Required <br />Additional Notes: <br />Approved By: Date: 6 <br />u 91 1 Z / <br />