My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell Inc. 3/9/2022 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
Brown and Caldwell Inc. 3/9/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 1:40:08 PM
Creation date
3/18/2022 1:38:52 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell Inc.
Approval Date
3/9/2022
Council Approval Date
3/2/2022
End Date
12/31/2023
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
WO3755
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002939
Total Compensation
$413,614.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Brown and Caldwell Inc. 6/1/2021
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Portal 4 Improvements <br /> Geotechnical Services Scope of Work <br /> Valve Vaults <br /> • Modulus of sub-grade reaction. <br /> • Buoyant-uplift risks associated with groundwater. <br /> • Capillary break material recommendations. <br /> Spread Footings and Soil-Retaining Structures <br /> • Settlement values (total and differential). <br /> • Minimum depth to bottom of footing. <br /> • Backfill and compaction recommendations. <br /> • Temporary shoring wall design parameters for the construction phase and final sheet pile wall design <br /> criteria for permanent sheet piles as appropriate to the project and site. <br /> Seismic Design <br /> • Seismic soil profile and Site Class per International Building Code (IBC) (governing edition or other <br /> governing code for the site location). Defer to the more stringent code. <br /> • Description of seismic setting, historical seismicity, and location of closest seismic records used in the <br /> site evaluation. <br /> • Soil pressures on walls due to seismic loads, including recommendations as to whether these soil <br /> seismic pressures are to be combined with active or at-rest static soil lateral pressures. <br /> • For Seismic Design Category (SDC) C, D, E, or F, the geotechnical report shall include an evaluation of <br /> slope instability, liquefaction, total and differential settlement, and surface displacement due to faulting <br /> or seismically induced lateral spread or flow.The report shall contain recommendations for appropriate <br /> foundation designs or other measures to mitigate the effects of these hazards, where approved by the <br /> authority having jurisdiction. <br /> • For SDC D, E, or F, additional geotechnical report requirements shall be addressed per American Society <br /> of Civil Engineers (ASCE) 7-16. <br /> • The geotechnical consultant shall review seismic specifics with the BC structural engineer for clarity of <br /> final needs and concerns. <br /> Other <br /> • Rock or soil anchors, sheet piling, shoring, rolling surcharge, etc.,that may be appropriate based on the <br /> project and site. <br /> • Recommendations for road improvements/replacement of the gravel road sections for the case that the <br /> valve vaults for transmission line 2 and 3 are installed at the location of the existing roadway at the <br /> bottom of the Portal 4 slope (see Exhibit A, page 3). <br /> • Recommendations and design parameters for contractor designs related to means and methods shall <br /> be provided—including, but not limited to, dewatering, temporary excavations and shoring systems, etc. <br /> However, the geotechnical consultant shall avoid defining or designing means and methods for the <br /> contractor and present their directions as recommendations/suggestions to the contractor. Ultimately, <br /> the contractor shall own their choices for means and methods. <br /> IBrown Am Caldwell <br /> 3 <br /> Attachment A Geotech Services SOW <br />
The URL can be used to link to this page
Your browser does not support the video tag.