My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 3/9/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
WA ST Dept of Ecology 3/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 11:35:37 AM
Creation date
4/1/2022 11:26:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
3/9/2022
Council Approval Date
2/23/2022
End Date
3/31/2023
Department
Public Works
Department Project Manager
Richard Tarry
Subject / Project Title
2021-2023 Biennial Stormwater Capacity Grants
Tracking Number
0003284
Total Compensation
$50,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocIJSign Envelope ID:FFOED9CA-93AF-4236-911A-3CEA87DF605F <br /> UM DEPARTMENT OF <br /> ewe ECOLOGY <br /> °IWO <br /> State of Washington <br /> Agreement No. WQSWCAP-2123-EverPW-00171 <br /> WATER QUALITY STORMWATER CAPACITY AGREEMENT <br /> BETWEEN <br /> THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br /> AND <br /> CITY OF EVERETT <br /> This is a binding Agreement entered into by and between the state of Washington,Depai tment of Ecology,hereinafter <br /> referred to as"ECOLOGY,"and City of Everett,hereinafter referred to as the"RECIPIENT,"to carry out with the <br /> provided funds activities described herein. <br /> GENERAL INFORMATION <br /> Project Title: 2021-2023 Biennial Stormwater Capacity Grants <br /> Total Cost: $50,000 00 <br /> Total Eligible Cost: $50,000.00 <br /> Ecology Share: $50,000.00 <br /> Recipient Share: $0.00 <br /> The Effective Date of this Agreement is: 07/01/2021 <br /> The Expiration Date of this Agreement is no later than: 03/31/2023 <br /> Project Type: Capacity Grant <br /> Project Short Description: <br /> This project will assist Phase I and II Permittees in implementation or management of municipal stormwater programs. <br /> Project Long Description: <br /> N/A <br /> Overall Goal: <br /> This project will improve water quality in the State of Washington by reducing stormwater pollutants discharged to state <br /> water bodies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.