Laserfiche WebLink
w N (- 1 III l <br /> N COVER SHEET <br /> Permit#: PW2103-001 ' <br /> i FOR Site Address: 3523 BROADWAY AVE <br /> GENERAL SITE NOTES: BROWN BEAR CAR WASH Owner: CAR WASH ENTERPRISES INC <br /> Tenant: [TenNamel <br /> 1. THE CONTRACTOR SHALL OBTAIN AND HAVE AVAILABLE COPIES OF THE APPLICABLE SEC.29,TWN. 29 N., RGE. 5 E.W.M. <br /> GOVERNING AGENCY STANDARDS AT THE JOB SITE DURING THE RELATED CONSTRUCTION El App. 3/1/2021. <br /> OPERATIONS. CITY OF EVERETT, KING COUNTY,WASHINGTON pp' <br /> 2. CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS HAVE BEEN OBTAINED Proposed Use: <br /> PRIOR TO COMMENCING WORK. Pill EX SELF <br /> SERVE Description: DEMO FUEL CANOPY AND LIST'S TO BE <br /> 3 AND DEPTH OFTHE OR SHALL BE ALL T.EXISTING OTHER <br /> THRE TO CONSTRUCTION VERIFYING THE LOCATION, <br /> OIMENSION <br /> SHOWN ON 0 10' 20' �j/ W // REPLACED WITH ASPHALT <br /> THESE PLANS OR NOT.UTILITIES OTHER THAN THOSE SHOWN MAY EXIST ON THIS SITE. <br /> ONLY THOSE UTILITIES WITH EVIDENCE OF THEIR INSTALLATION VISIBLE AT GROUND 1`=20' 1 <br /> SURFACE OR SHOWN ON RECORD DRAWING PROVIDED BY OTHERS ARE SHOWN HEREON. �1 Date: i‘19-1 <br /> EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE ONLY AND ARE Reviewed By: <br /> SUBJECT TO A DEGREE OF UNKNOWN VARIATION.SOME UNDERGROUND LOCATIONS <br /> SHOWN HEREON MAY HAVE BEEN TAKEN FROM PUBLIC RECORDS. BARGHAUSEN ii <br /> CONSULTING ENGINEERS,INC.ASSUMES NO LIABILITY FOR THE ACCURACY OF PUBLIC / 5 Office Set Job Site Set Fire/Planning Set <br /> RECORDS OR RECORDS OF OTHERS.IF CONFLICTS SHOULD OCCUR,THE CONTRACTOR ^ --�'--� — <br /> SHALL CONSULT BARGHAUSEN CONSULTING ENGINEERS,INC.TO RESOLVE ALL • ` •� <br /> PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. II M"4 - <br /> APPROXIMATE LOCATION OF .,,i] ��v� <br /> � _ <br /> 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND •PROPERTY UNE . <br /> SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR TO THE INITIATION I t x x <br /> OF CONSTRUCTION.SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS /T/ j (P y m <br /> RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE CODES,IT IS THE CONTRACTOR'S // /I "'10 <br /> RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO / Ex Auro �I { - <br /> THE START OF CONSTRUCTION.FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ,J SENTRY //. a n 8 <br /> ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE I/ BUILOMG _ i► . <br /> CONTRACTOR TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND //� U) W OWNER <br /> IN FULL COMPLIANCE WITH LOCAL REGULATIONS AND CODES. <br /> A[ .0 n) CAR WASH ENTERPRISES,INC. <br /> \J <br /> 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE APPROPRIATE UTILITIES 3977 LEARY WAY NORTHEAST <br /> INVOLVED PRIOR TO CONSTRUCTION. l'''''J <br /> Q 1l. SEATTLE,WASHINGTON 98107 <br /> I I Al 0 CONTACT:JOE GIUSEFFI <br /> 6. INSPECTION OF SITE WORK WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE �� I I •,,_! in NN Y""' EMAIL:JOE.CIUSEFFIOBROWNBEAR.COM (, O <br /> GOVERNING JURISDICTION.INSPECTION OF PRIVATE FACILITIES WILL BE ACCOMPLISHED / txj <br /> BY A REPRESENTATIVE OF THE OWNER.IT SHALL BE THE CONTRACTOR'S / I I QO ENGINEER Z <br /> RESPONSIBILITY TO NOTIFY THE INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING / BARGHAUSEN CONSULTING ENGINEERS,INC. <br /> ALL CONSTRUCTION. (/� I © 18215 72ND AVE.SOUTH <br /> IYJI: /J sm� KENT,WA 98032 W z Z <br /> 7. PRIOR TO ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY THE CONTRACTOR SHALL I } 1 �+4 TEL:(425)251-6222 (n 0 <br /> CONTACT THE AGENCY AND/OR UTILITY INSPECTION PERSONNEL AND ARRANGE ANY / W FAX:(425)251-8782 E2 1.-- <br /> REQUIRED PRE-CONSTRUCTION MEETING(S).CONTRACTOR SHALL PROVIDE ONE WEEK AY V CONTACT: CHRIS JENSEN.P.E. W Q <br /> MINIMUM ADVANCE NOTIFICATION TO OWNER,FIELD ENGINEER AND ENGINEER OF /.; OQ z <br /> CD <br /> PRE-CONSTRUCTION MEETINGS. < r. <br /> >- / //f CML SHEET INDEX: W >- _ <br /> B. THE CONTRACTOR IS RESPONSIBLE FOR WORKER AND SITE SAFETY AND SHALL COMPLY Q f f / 4,' �' (Y (n <br /> WITH THE LATEST OSHA STANDARDS AND REGULATIONS,OR ANY OTHER AGENCY HAVING j (/ Q C1.0-COVER SHEET Z Q <br /> JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES.THE CONTRACTOR IS Q Z C2.0- DEMOLITION AND TESL PLAN W W <br /> RESPONSIBLE FOR DETERMINING THE'MEANS AND METHODS'REQUIRED TO MEET THE Q Ex CARWASH C3.0 -SITE PLAN .__I <br /> INTENT AND PERFORMANCE CRITERIA OF OSHA,AS WELL AS ANY OTHER ENTITY THAT 0 <br /> _ <br /> HAS JURISDICTION FOR EXCAVATION AND/OR TRENCHING PROCEDURES. m fj /,I (, Q J <br /> 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, Ir%/f �� g <br /> SAFETY DEVICES,PROTECTIVE EQUIPMENT,FLAMERS,AND ANY OTHER NEEDED ACTIONS / CO Q <br /> TO PROTECTYTHEC NEC,HEALTH,ITH AND SAFETY A THE PUBLIC,AND TO PROTECT II UPROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE //J Il CONTRACTOR.ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT /NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH UNE OF l�JJJTRAFFIC AFFECTED. ije -• <br /> 10.PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ALL ( `T,2E©pRIOVIED^,q^ LLADJACENT PUBLIC AND PRIVATE PROPERTIES AT ALL TIMES DURING CONSTRUCTION.THE �(// !l /1 f�� <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING UTILITY / - 'j c.if lS JEp <br /> SERVICES THAT ARE TO REMAIN OPERATIONAL WITHIN THE CONSTRUCTION AREA ////Z/ 4 Er F M/ Spry <br /> WHETHER SHOWN OR NOT SHOWN ON THE PLANS. -G/� ,/ CITY OF E� y 11. TWO(2)COPIES OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER ( i Permit Services R F T ` � <br /> CONSTRUCTION IS IN PROGRESS.ONE(1)SET WITH RECORDS OF AS-BUILT f P 4767t a 'ram <br /> INFORMATION SHALL BE SUBMITTED TO BARGHAUSEN CONSULTING ENGINEERS,INC.AT ' • <br /> COMPLETION OF PROJECT. '4O `r`r9 TWA liLCNG���. <br /> III 112. CONTRACTOR SHALL OBTAIN SERVICES OF A LICENSED LAND SURVEYOR TO STAKE • ' . y 4/1/21 <br /> HORIZONTAL CONTROL FOR ALL NEW IMPROVEMENTS.STAKING CONTROL SHALL BE ' ' <br /> TAKEN FROM ELECTRONIC PLAN ALES PROVIDED BY BARGHAUSEN CONSULTING %e, - <br /> ENGINEERS,INC. • ° a $ <br /> A ' • 2 ' Y .413. CONTRACTOR SHALL REQUEST FROM BARGHAUSEN CONSULTING ENGINEERS, INC.,PRIOR PROJECT SCOPE: x <br /> TO ANY CONSTRUCTION STAKING OR CONSTRUCTION WORK,A FORMAL CONSTRUCTION ' <br /> RELEASE PLAN SET OR SPECIFIC RELEASE IN WRITING.THE APPROVED AGENCY PERMIT ° ° r CONTRACTOR SHALL REMOVE EXERTING USTS,FUEL PIPING.FUEL CANOPY.MPDS AND APPURTENANCES <br /> DRAWINGS WILL NOT BE CONSIDERED CONSTRUCTION RELEASE PLANS BY BARGHAUSEN . '• i PERTAINING TO FUEL OPERATIONS.THE SITE PLAN DELINEATES THE MINIMUM REQUIRED PAVEMENT REMOVAL. <br /> CONSULTING ENGINEERS,INC.UNLESS BARGHAUSEN CONSULTING ENGINEERS,INC.HAS [ I IT MAY BE NECESSARY TO REMOVE ADDITIONAL PAVEMENT AREA TO ACCOMPUSH PROJECT SCOPE. n <br /> GIVEN A FORMAL WRITTEN RELEASE OR ISSUED A CONSTRUCTION RELEASE PLAN SET. • - CONTRACTOR TO CONFIRM WITH OWNER EXTENTS OF REMOVAL PRIOR TO CONSTRUCTION. 8 B <br /> 0 2 - <br /> � LOT COVERAGE SUMMARY 0 (13, ` <br /> EXISTING PROPOSED EXISTING PROPOSED EXISTING CONDITIONS NOTE: <br /> F'XISTINQ PROPOSED \:•:„..j ti <br /> IMPERVIOUS: 1,900 SF 1,900 SF POTENTIAL IITRTII'CONFLICT.CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO C <br /> PERVIOUS: 0 SF 0 SF CONSTRUCTION.SEE LJIILIIY CONFLICT NOTE THE EXISTING CONDITIONS SHOWN ARE APPROXIMATE.BASED <br /> BARRIER CURB UTILITY POLE -o- ON OS DATA AND'AS-BUILY RECORDS.THE GENERAL CONTRACTOR SHAD.'POTHOLE'THE EXISTING Ir F <br /> TOTAL DISTURBANCE TT 1,900 SF MIMES WITHIN THE LIMITS OF DISTURBANCE TO VERIFY THE SIZE AND VERTICAL AND HORIZONTAL <br /> TH STREET <br /> LOCATION PRIOR TO CONSTRUCTION.ANY WITH THE DESIGN SHALL BE BROUGHT TO THE IMMEDIATE QQQy��) <br /> CONCRETE JUNCTION BOX(TYPE 1,2,3) ®0 co 'n�'nEC 1 ATTENTION OF THE OWNER AND BARGHAUSEN CONSULTING ENGINEERS,INC.(425-251-6222). C i <br /> ASPHALT LUMINAIRE •C 6' E <br /> ESTIMATED EARTHWORK QUANTITIES: ; $ 2 <br /> SURVEY MONUMENT NOTE: W <br /> PAINT STRIPING YARD LIGHT Ea CUT:450CY CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR OBTAINING PERMITS FROM THE WASHINGTON STATE tcp <br /> C C <M <br /> • DEPARTMENT OF NATURAL RESOURCES FOR REMOVING AND REPLACING ALL SURVEY MONUMENTATION THAT up2 T���111 <br /> SAWCUT FILL: 850 CY COMPLETEDMAY BE BY ADREGISTE BY CONSTRUCTION LAND SURVEYOR APPUCATIONS FOR PERMITS PURSUANT TO WAC 2TO REMOVE MONUMENTS MAY (O. APPLICATIONS MUST BE D = C<, <br /> BE OBTAINED FROM THE WASHINGTON STATE DEPARTMENT OF NATURAL RESOURCES,OR BY CONTACTING THEIR .0 g p`T 3 <br /> BOLLARD o NET:400 CY(FILL) - OFFICE BY TELEPHONE AT(206)902-1190. w C'4 o <br /> SIGN T1 - PUBLICILAND SATED OFFICE 00 C a. ,v4v77 <br /> AREA TO BE DISTURBED-1,900 SF GTON STATE DEPARTMENT OF NATURAL RESOURCES m V Y.t v <br /> 1111 WASHINGTON STREET S.E. <br /> BUILDING LINE ////// P.O.BOX 47060 <br /> EARTHWORK ARE APPROXIMATE AND HIGHLY DEPENDANT ON <br /> STORM LINE —SD— SOIL CONDITIONSONS ENCOUNTERED <br /> UNTERED DURING CONSTRUCTION.CONTRACTOR OLYMPIA,WASHINGTON 9a504-7060 0 <br /> SHOULD PERFORM INDEPENDENT ESTIMATE FOR BIDDING. o' <br /> UPON COMPLETION OF CONSTRUCTION, ALL MONUMENTS DISPLACED, REMOVED, OR DESTROYED SHALL BE <br /> CATCH BASIN TYPE 1 0 REPLACED BY A REGISTERED LAND SURVEYOR,AT THE COST AND AT THE DIRECTION OF THE CONTRACTOR, TP <br /> PURSUANT TO THESE REGULATIONS. THE APPROPRIATE FORMS FOR REPLACEMENT OF SAID MONUMENTATION i <br /> SHALL ALSO BE THE RESPONSIBILITY OF THE CONTRACTOR. <br /> CATCH BASIN TYPE 2 0 // DTI 1Tv <br /> SANITARY SEWER LINE ! U L 1LL L L CONFLICT NOTE: s <br /> SANITARY SEWER MANHOLE p THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,DIMENSION,AND DEPTH OF ALL i <br /> Know what's below. r EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE UTILITIES AND M <br /> MONITORING WELL(AS 81SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION.THIS SHALL INCLUDE $ cr) <br /> NOTED) o Call before you dig. �•� CALLING UTILITY LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF E $ i <br /> Dial 811 - NEW UTTLJtt CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST.IF CONFLICTS SHOULD _ po <br /> POWER OVERHEAD --c(C„)—. OCCUR.THE CONTRACTOR SHALL NOTIFY BARGHAUSEN CONSULTING ENGINEERS.INC.TO RESOLVE ALL '^ <br /> PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. N . <br /> 0 <br />