My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5033 CLAREMONT WAY FABER CONSTRUCTION 2023-06-12
>
Address Records
>
CLAREMONT WAY
>
5033
>
FABER CONSTRUCTION
>
5033 CLAREMONT WAY FABER CONSTRUCTION 2023-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 11:08:05 AM
Creation date
4/1/2022 1:30:55 PM
Metadata
Fields
Template:
Address Document
Street Name
CLAREMONT WAY
Street Number
5033
Tenant Name
FABER CONSTRUCTION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> = PUBLIC WORKS DEPARTMENT <br /> Utilities Division,3200 Cedar Street <br /> Everett WA 98201 <br /> E V E R E T T 425-257-8800 <br /> WASHINGTON COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> X Cost of Work Order $7170.00 Work Order# <br /> Cost of Service Order Service Order# <br /> Requested By: Jim Spooner <br /> Contact Person Rick Faber Telephone# 360 815-4231 <br /> Email Address: rick@faberconstruction.com Date of Request 9-2-2021 <br /> Property Owner(name) Faber Bros Investment LLC <br /> Charge Cost to (name if different than owner) Attn: Rick Faber <br /> Address 5033 Claremont Way City Everett, WA Zip 98203 <br /> Installation Location 5033 Claremont Way <br /> Installation type/description/size/etc. Modify existing 2". Move existing 2" meter from in front of <br /> building at 5017 to in front of building at 5033 owner request. <br /> U The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 4"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $2747.00 cc: Bldg.Permit Center <br /> (EverettEPS@EverettWA.gov) <br /> Labor and Benefits $2538.00 Matt Welborn-Email&HC <br /> Randy Allen-Email <br /> Equipment Rental $780.00 Jim Spooner-HC <br /> Tax $305.00 Sabrina Fandler-Email <br /> Grant Moen-Email <br /> Restoration $800.00 Thad Newport-Email <br /> TOTAL $7170.00 Terri Jorgenson-Email <br /> Prepared by: Jim Spooner Date Estimate Prepared 9-9-2021 <br /> Accepted by: 14 Representing i rel 5 r e-e- <br /> 9.15.21 <br /> S:1#Common\clerical\Cost.est\2021\5033 Claremont W. <br /> loft <br />
The URL can be used to link to this page
Your browser does not support the video tag.