Laserfiche WebLink
2/28/2022 Page I <br /> City of Everett <br /> 7:22:28AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2201-156 Site Address 1425 SE EVERETT MALL WAY <br /> Applied 1/21/2022 Applicant TRAVIS STEELE Lot <br /> Approved 1/21/2022 Owner EVERETT MALL 11 LLC Block <br /> Issued 1/21/2022 Contractor STEELE ELECTRIC INC Tract <br /> Parent Permit No. B2110-050 Description COMMERCIAL TI <br /> Notes REMODEL OF EXTG BLDG <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 1/25/2022 1/25/2022 ELEC 06-ROUGH SKB APPROVAL as noted 1/24/2022 2:49 PM STEELE ELECTRIC <br /> IN INC <br /> AM inspection please <br /> Contact Name:STEELE ELECTRIC INC <br /> Site Address:4722 bayview In <br /> Phone:4258767488 <br /> e-Mail:travis@steeleec.com <br /> (1/25/2022 11:08 AM SKB) <br /> OK walls and hard lids and pony wall at <br /> counter.Nothing in maize area.Contractor <br /> reestablishing sprinkler bond etc.To be <br /> checked on next inspection. <br /> 2/23/2022 2/23/2022 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 2/21/2022 5:37 PM STEELE ELECTRIC <br /> Request INC <br /> Contact Name:STEELE ELECTRIC INC <br /> Site Address: 1425 SE EVERETT MALL <br /> WAY <br /> Phone:4258767488 <br /> e-Mail:travis@steeleec.com <br /> (2/23/2022 2:44 PM SKB) <br /> Provide a proper sized grounding electrode <br /> conductor to the sprinkler water electrode <br /> from the service.Delete the hanging wire in <br /> the front west corner of the building for the <br /> KO seal box in the back wall toward the <br /> West. <br /> 2/24/2022 2/24/2022 ELEC 09-FINAL SKB APPRVD-PERN eTRAKiT Inspection 2/23/2022 2:55 PM STEELE ELECTRIC <br /> Request INC <br /> Contact Name:STEELE ELECTRIC INC <br /> Site Address: 1425 SE EVERETT MALL <br /> WAY <br /> Phone:4258767488 <br /> e-Mail:travis@steeleec.com <br /> INSP12 C SYSTE S <br />