Laserfiche WebLink
2/4/2022 Page 1 <br /> City of Everett <br /> 6:31:25AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. P2107-012 Site Address 9204 EVERGREEN WAY <br /> Applied 7/9/2021 Applicant HONG PHAN Lot <br /> Approved 7/9/2021 Owner KARDACK ROBERT N Block <br /> Issued 8/2/2021 Contractor HONGS GENERAL CONST&PLUMBING Tract <br /> Parent Permit No. B2104-078 Description REMOVE EXISTING INTERIOR IMPROVEMENTS/DIVIDE BL <br /> Notes TENANT SPACES/ADD ADA RESTROOMS AND SPA TREATMENT ROOMS/STOREFRONTS <br /> REPLACED WITH GLASS AND ALUMINUM/ROOFING FOLLOWS IBC 1511**LANDSCAPE <br /> INSPECTION BEFORE FINAL** <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 10/1/2021 10/1/2021 PLUMB JJM CORRECTION HANG 206-227-2275 <br /> 03-ROUGH IN <br /> (10/1/2021 11:09 AM JJM) <br /> Multiple corrections: <br /> -Toilets in ADA restrooms not plumbed to <br /> ADA specs. <br /> -Need 18"center on flange from side wall <br /> on both newly plumbed toilets. <br /> -Venting from toilet has excessive <br /> horizontal bends under slab and cannot be <br /> used to wet vent bathroom sink in middle <br /> restroom. <br /> -2"drain from AW and other fixtures is <br /> back graded and needs to be set at 2% <br /> slope. <br /> -Repair leaking nut and ferrule under slab <br /> on trap primer line. <br /> -Put back on test and recall for inspection. <br /> ***Hong is installing 2 RPBA devices for <br /> hot and cold water lines to pedicure spa <br /> chairs.Will need to confirm units are <br /> installed and tested by a liscensed backflow <br /> assembly tester before final plumbing is <br /> approved'' <br /> 10/4/2021 10/4/2021 PLUMB JJM APPROVAL HANG 206-227-2275 <br /> 03-ROUGH IN <br /> 1/28/2022 1/28/2022 PLUMB 07-FINAL JJM CORRECTION HANG 206-227-2275 <br /> (1/28/2022 9:54 AM JJM) <br /> -Run condensate to exterior of building in <br /> 3/4"PVC to terminate in downspout drain <br /> in concrete.Grade at minimum 1%slope. <br /> -Add gas flex rated for 199,999 btus to <br /> tankless for seismic relief. <br /> -Uncross water at bathroom lay. <br /> -Have both RPBA's tested by licensed BAT <br /> with inspection report sent to the city before <br /> final. <br /> -Fix leak on cold inlet to point of use water <br /> heating unit in back bathroom. <br /> -Install flow limiting aerator on back bath <br /> faucet to increase water temp to between <br /> 100 and 120 degrees F. <br /> 2/3/2022 2/3/2022 PLUMB 07-FINAL JJM APPRVD-PERK HANG 206-227-2275 <br /> INSP12 <br />