My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9204 EVERGREEN WAY 2022-04-01
>
Address Records
>
EVERGREEN WAY
>
9204
>
9204 EVERGREEN WAY 2022-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 1:55:07 PM
Creation date
4/1/2022 1:53:56 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9204
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/3/2022 Page I <br /> City of Everett <br /> 2:07:42PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. PW2105-041 Site Address 9204 EVERGREEN WAY <br /> Applied 5/21/2021 Applicant THOMAS THOMPSON Lot <br /> Approved 5/27/2021 Owner KARDACK ROBERT N Block <br /> Issued 5/27/2021 Contractor HONGS GENERAL CONST&PLUMBING Tract <br /> Parent Permit No. Description SITE WORK FOR INTERIOR T.I.-LABELLA NAILS,LASH&I <br /> Notes Site work permit for parking lot striping,wheel stops,and landscaping to comply with code requirements. <br /> Total building area=1809sf.Tenant A=1204sf,Tenant B=605sf. <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 7/20/2021 Any 2/23/2022 PLANNING GEP APPROVAL eTRAKiT Inspection 7/20/2021 12:42 PM Donald Whitfield <br /> LANDSCAPING Request <br /> Contact Name:Donald Whitfield <br /> Site Address:9204 EVERGREEN WAY <br /> Phone: 1425870841 <br /> e-Mail:don.whitfield@hotmail.com <br /> A Landscape Inspection is required by the <br /> Planning Department prior to final by the <br /> Public Works Inspector.To schedule a <br /> planning inspection,contact <br /> Planning@everettwa.gov and request an <br /> inspection with the permit number <br /> (PW2105-041),site address(9205 Holly <br /> Dr),and inspection type listed.Please allow <br /> up to one week for the inspection to be <br /> scheduled. <br /> 7/21/2021 7/21/2021 PW 22-OTHER JHK APPROVAL (7/21/2021 2:57 PM JHK) <br /> public works ok with striping and wheel <br /> stop. <br /> 2/3/2022 2/3/2022 PW 25-SITE JHK CORRECTION need planning (2/3/2022 10:48 AM JHK) <br /> FINAL/PERMIT completed Finish planters,curbing,trash enclosure, <br /> sidewalk. <br /> 2/8/2022 2/8/2022 PW 25-SITE JHK CORRECTION (2/8/2022 12:08 PM JHK) <br /> FINAL/PERMIT Need landscaping <br /> 2/22/2022 2/22/2022 PW 25-SITE JHK PARTIAL APPR need landscaping <br /> FINAL/PERMIT inspection <br /> 2/23/2022 2/23/2022 PW 25-SITE JHK APPRVD-PERI' <br /> FINAL/PERMIT <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.